View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Local Government Engineering Department (LGED) Procuring Entity Name : Office of the Executive Engineer, LGED, Noakhali
Procuring Entity Code : Procuring Entity District : Noakhali
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : APP ID : 139838 Tender/Proposal Status :
App ID : 139838 Tender/Proposal ID : 370772
Re-Tendered ID :    
Key Information and Funding Information :
Procurement Method : One stage Two Envelopes Tendering Method (OSTETM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 5-3731-5267 Project Name : Greater Noakhali District Rural Infrastructure Development - 3rd Phase
Tender/Proposal Package No. and Description : GNP-3/NOA/CHA/18-19/W-137
A. i Improvement of Bansha-Horipur Megha road Nischintapur Saw mill-Sofique Miah bari road. at Ch.1576-2076m . ID No. 475104035 A. ii Providing 100.00m Palisading work B.i Improvement of Razzakpur Torab bepari road Ailerpukur Razzakpur Eidgaon road Kalu Chowdhury road-Dristinandon road at Ch.00-457m . ID No. 475105110 B.ii Providing 150.00m Palisading work Value of Recovered Material58205.05 C.i Improvement of Hirapur Community Clinic Dristinandon road at Ch.00-500m . ID No. 475105308 C.ii Providing 76.00m Palisading workC.iii Construction of 1No U-Drain Culvert at Ch.10m.
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
12-Nov-2019 21:45 Tender/Proposal Document last selling /
downloading Date and Time :
27-Nov-2019 16:00
Pre - Tender/Proposal meeting Start
Date and Time :
12-Nov-2019 23:00 Pre - Tender/Proposal meeting End
Date and Time :
19-Nov-2019 15:00
Tender/Proposal Closing
Date and Time :
28-Nov-2019 12:00 Tender/Proposal Opening
Date and Time :
28-Nov-2019 12:00
Last Date and Time for Tender/Proposal Security
Submission :
28-Nov-2019 11:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As Per TDS

Brief Description of Works :

GNP-3/NOA/CHA/18-19/W-137
A. i Improvement of Bansha-Horipur Megha road Nischintapur Saw mill-Sofique Miah bari road. at Ch.1576-2076m . ID No. 475104035 A. ii Providing 100.00m Palisading work B.i Improvement of Razzakpur Torab bepari road Ailerpukur Razzakpur Eidgaon road Kalu Chowdhury road-Dristinandon road at Ch.00-457m . ID No. 475105110 B.ii Providing 150.00m Palisading work Value of Recovered Material58205.05 C.i Improvement of Hirapur Community Clinic Dristinandon road at Ch.00-500m . ID No. 475105308 C.ii Providing 76.00m Palisading workC.iii Construction of 1No U-Drain Culvert at Ch.10m.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 2000
Mode of Payment :
Tender/Proposal Security Valid Up to : 24-Apr-2020
Tender/Proposal Valid Up to : 27-Mar-2020
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 A. (i) Improvement of Bansha-Horipur â?? Megha road (Nischintapur Saw mill-Sofique Miah bari road.) at Ch.1576-2076m . ID No. 475104035, A. (ii) Providing 100.00m Palisading work, B.(i) Improvement of Razzakpur Torab bepari road (Ailerpukur) â?? Razzakpur Eidgaon road (Kalu Chowdhury road-Dristinandon road ) at Ch.00-457m . ID No. 475105110, B.(ii) Providing 150.00m Palisading work (Value of Recovered Material=58205.05), C.(i) Improvement of Hirapur Community Clinic â?? Dristinandon road at Ch.00-500m . ID No. 475105308, C.(ii) Providing 76.00m Palisading work,C.(iii) Construction of 1No U-Drain Culvert at Ch.10m. Chatkhil upazilla,Noakhali 270000 01-Jan-2020 30-Jun-2021
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : M A Sattar Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: XEN Office, LGED Bhaban, Old Hospital Road, Maijdee, Noakhali
City: Noakhali
Thana: Noakhali Sadar
District: Noakhali - 3800
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0321-61340
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Correction in TDS & PCC

Field Name Old Value New Value
PCC--A. General--

The Contractor is
[Name, address, and name of authorized representative]
 

The Contractor is: As per Noa

PCC--A. General--

The Project Manager is
[Name, address, and name of authorized representative]

 


 

The Project Manager is:

The Upazila Engineer, LGED
Upazila: Chatkhil
District: Noakhali

Also supervise & monitoring SE(Region), PD, XEN, UAE, SAE & WA
Local Government Engineering Department

PCC--A. General--

The PE is
[Name, address, and name of authorized representative]
 

As per Noa

PCC--A. General--

The PE is
[Name, address, and name of authorized representative]

The Development Partner is [Name of the DP]

The Procuring Entity is
Local Government Engineering Department

Represented by:
Executive Engineer
Local Government Engineering Department
District: Noakhal

Development partner is N/A

PCC--A. General--

The Site is located at [location] and is defined in drawings No: 
[insert numbers]
 

The Site is located at-

Upazila:Chatkhil
District: Noakhali

PCC--A. General--

The Start Date shall be  [insert date ]

[it is the last date when the Contractor shall commence execution of  the Works under the Contract reasonably immediately after the Commencement Date; refer to GCC  Clause 40]
 

The Start Date is stated in tender notice (Tentative). It is also Noted that the start date shall be within 07 days from Contract

PCC--A. General--

The Works consist of

[state brief summary, including relationship to other Contracts under the Project]

The Works consist of-

Earthworks, ISG, Sub-base, base-course, Dense Carpeting, Palisading, Construction and Protection work etc

PCC--A. General--

The original Contract price is [insert the amount in the NOA]

 

The original Contract price is As per NOA

PCC--A. General--

Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s);

[state date or dates  of possession of site] 
 

Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s): within 07(seven) days from the signing of contract agreement

PCC--A. General--

Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;

[insert name(s)]
 

Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;
1. Construction Project Manager (Graduate / Dip. in Civil Engg.) – 1 No.
2. Quality Control & Material Engineer (Graduate/ Diploma in Civil Engg.) – 1No.
3. Site Manager (Diploma in Civil Engg/HSC in Science ). –1No

PCC--A. General--

The Sectional Completion Dates are:

[state part of the works and the corresponding dates, if applicable]
 

The Sectional Completion Dates are:

Not Applicable

PCC--A. General--

Nominated Subcontractor(s)  named below;

____[insert name(s)]___________________________________________
shall be entitled to execute the following specific components of the Works

[state none ,if not applicable]
 

Nominated Subcontractor(s) named below;
shall be entitled to execute the following specific components of the Works :
Not applicable.

PCC--A. General--

The  Contractual matters between the PE and the Contractor shall be decided by

[state only  if other than the Project Manager]
 

The Contractual matters between the Procuring Entity and the Contractor shall be decided by
Not Applicable

PCC--A. General--

The PE’s address for the purpose of communications under this contract is :
Contact person:
Address:
Tel:
Fax:
e-mail address:


The Contractor’s address for the purpose of communications under this contract is :
Contact person:
Address:
Tel:
Fax:
e-mail address:

The Procuring Entity’s address for the purpose of communications under this contract is :
Contact person:
Executive Engineer
Local Government Engineering Department
District: Noakhali
Telephone: 0321-61340
Fax No.: 0321-62354
e-mail address: xen.noakhali@lged.gov.bd

The Contractor’s address for the purpose of communications under this contract is : (as per NOA)
Contact person:
Address:
Tel:
Fax:
e-mail address::

PCC--A. General--

The minimum insurance cover shall be:

(a)

The maximum deductible for insurance of the Works and of Plant and Materials is Tk [state amount]


[the Contractor shall provide this amount at the time of Contract signing].
 

(b)

The minimum cover for insurance of the Works and of Plant and Materials in respect of the Contractor’s faulty design is Tk [state amount].


[the amount could be 110% of the value of the works, plant and materials that may be lost in a worst case scenario].
 

(c)

The maximum deductible for insurance of Equipment is Tk [state amount].


[the Contractor shall provide this amount at the time of Contract signing].
 

(d)

The minimum cover for loss or damage to Equipment is Tk [state amount].


[the amount could be 110% of the replacement value of the equipment]
 

(e)

The maximum deductible for insurance of other property is Tk [state amount].


[the Contractor shall state this amount at the time of Contract signing].
 

(f)

The minimum cover for insurance of other property is Tk [state amount].


[it is the responsibility of the Contractor to obtain adequate insurance cover for such risks – recommended value 10% of contract price].
 

(g)

The minimum cover for personal injury or death insurance:


(i) for the Contractor’s employees is as per the law and common practice in Bangladesh.


(ii) and for third parties is as per the law and common practice in Bangladesh.
 

The minimum insurance cover shall be:

(a) The maximum deductible for insurance of the Works and of Plant and Materials is 0.3% of contract amount

 

(b) The maximum deductible for insurance of the Works and of Plant and Materials is 0.3% of contract amount

 

(c) The maximum deductible for insurance of Equipment is 0.3% of contract amount

 

(d) The minimum cover for loss or damage to Equipment is 110% of contact amount

 

(e) The maximum deductible for insurance of other property is 0.3% of contract amount.

 

(f) The minimum cover for insurance of other property is 10% of contact amount.

 

(g) The minimum cover for personal injury or death insurance:
(i) for the Contractor’s employees is as per the law and common practice in Bangladesh.
(ii) and for third parties is as per the law and common practice in Bangladesh.

 

PCC--A. General--

Other documents forming part of the Contract are; 

 

[list other documents viz. Schedule of other contractors, Schedule of Key Personnel, Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]

Other documents forming part of the Contract are: Work Programme.

PCC--A. General--

A Contractor or a Subcontractor  that is a national of, or registered in, the following countries are not eligible:

[state countries, if applicable]
 

A Contractor or a Subcontractor that is a national of, or registered in, the following countries are not eligible:

Israel.

PCC--A. General--

Materials, Equipments Plants and supplies shall not have their origin in  the following countries:

[state countries, if applicable]
 

Materials, Equipments Plants and supplies shall not have their origin in the following countries:

Israel

PCC--B. Time Control--

Commencement Date of Works shall be as follows;

[insert different commencement dates for different parts of the Works, if deemed appropriate]
 

Commencement Date of Works shall be as follows;
As NOA

PCC--B. Time Control--

The amount to be withheld for late submission of an updated Programme is [state amount].

The amount to be withheld for late submission of an updated Programme is : N/A

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.

[usually fifteen (15) days]
 

The Contractor shall submit a Programme for the Works within 14 (Fourteen) days of signing the Contract

PCC--B. Time Control--

The period between Programme updates is [state interval]

[usually bi-monthly or quarterly depending on the nature of the Works]
 

The period between Programme updates is 90 days

PCC--C. Quality Control--

The Defects Liability Period is [state months]

[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is 12 (Twelve) Months.

PCC--D. Cost Control--

The particulars of the Bank Account nominated are as follows :

Title of the Account : [insert title to whom the Contract awarded]
Name of the Bank : [insert name with code, if any]
Name of the Branch : [insert branch name with code ,if any]
Account Number : [insert number]
Address : [insert location with district]
Tel :
Fax :
e-mail address :

[information furnished by the Contractor shall be substantiated by the concerned Bank and authenticated by the PE]
 

The particulars of the Bank Account nominated are as follows :as per NOA.

Title of the Account :
Name of the Bank :
Name of the Branch :
Account Number :
Address :
Tel :
Fax :
e-mail address

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:


[list events or state none ]
 

The following additional events shall also be the Compensation Events:
None

PCC--D. Cost Control--

The Contract is not subject to price adjustment.
OR
The Contract is subject to price adjustment, the weightings or coefficients for adjustment are:

[Price Adjustment Formulae to be applicable if stated under ITT Sub Clause 27.10 shall be specified here]
Example:
P= A + a (Lm/Lo)+ b (BIm/BIo)+ c (CEm/CEo)+ d (RSm/RSo)+ e (STm/STo)+ f (BRm/BRo)+g (MIm/MIo) + h (FUm/FUo)+ etc
where;
L= Labor, BI=Bitumen, CE=Cement, RS=Reinforcing Steel, ST=Stone, BR=Bricks, MI=Miscellaneous, FU= Fuel ]
Weighting or Coefficient A equals between 0.10 and 0.15 and, B (a+b+c+d+e+f+g+h+etc) equals between 0.90 and 0.85.

[insert figure] non-adjustable component (coefficient A)
[insert figure] adjustable component (coefficient B)
[The sum of A+B shall equal ONE (1). It is usual to have value of A between 0.10 and 0.15 and that of B between 0.90 and 0.85. Breakdown of B shall be provided in Appendix to the Tender.]
[delete as appropriate]

[price adjustment clauses are usually only permitted for Works Contracts, execution of which will take more than eighteen (18) months from Start Date to Completion Date. The PE must consider each Contract on its individual merit; approval of HOPE required for Contracts of less than eighteen (18) months]
 

The Contract is not subject to price adjustment.

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.


[state “none’ if not applicable. If applicable then the proportion of Retention Money shall be equal to the percentage-shortfall of ten (10) percent of Performance Security determined at the time of signing the Contract. Again in case of unbalanced Tender or because of front loading, provision for Retention Money shall not be applicable]
 

The proportion of payments to be retained is 5% (Five) percent for each payment.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of its Contract price per day of delay]
Guide to application of GCC Sub Clause 76.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x Px n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay
n = No of days of delay for completion of works under the Contract]

 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.


[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]

 

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.10 (zero point one zero) percent of its Contract price per day of delay.

The maximum amount of liquidated damages for the whole of the Works is 10% (ten percent) of the final Contract Price.

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.

PCC--D. Cost Control--

The Bonus for the whole of the Works is [insert percentage] percent of the final Contract price per day.

The maximum amount of Bonus for the whole of the Works is [insert percentage] percent of the final Contract price.

[if early completion would provide benefits to the PE, this clause should remain, otherwise state “Not Applicable”. The bonus is usually numerically equal to the Liquidated Damages]
 

The Bonus for the whole of the Works :Not Applicable

The maximum amount of Bonus for the whole of the Works :Not Applicable

PCC--D. Cost Control--

The Advance Payment shall be Tk [insert amount] and shall be paid to the Contractor not later than [insert date].

[for 100 percent GoB funded procurement, advance payments are not recommended unless otherwise specifically decided by the Government. An advance payment, if admissible, shall be made for mobilisation, considering the nature of the works. The recommended maximum advance payment is ten (10) percent of the original Contract price against an unconditional Bank Guarantee (Form e-PW3-10.) On the contrary, advance payments may be applicable for procurements under aided projects]
 

The Advance Payment:
Not Applicable

PCC--D. Cost Control--

The percentage for adjustment of Provisional Sums is

____% (_________percent)
[state none, if not applicable. Usually covers the VAT, profit and overhead costs]
 

TThe percentage for adjustment of Provisional Sums is
None

PCC--E. Completion of the Contract--

The date by which “as-built” drawings are required is [insert date]

 

The date by which operating and maintenance manuals are required is [insert date]

The date by which “as-built” drawings are not applicable.

The date by which operating and maintenance manuals are required is : N/A

PCC--E. Completion of the Contract--

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]

[usually a very nominal amount]
 

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk. maximum 0.01% (zero point zero one percent) of the final amount.

PCC--F. Termination and Settlement of Disputes--

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 10 (Ten) percent. [When additional performance security is applicable due to the tender is significantly below the official estimated cost or unbalanced as a result of front loading 10% will be replaced by “ Additional performance security plus 10%

PCC--G. Claims, Disputes and Arbitration--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]

The arbitration shall be conducted in the place mentioned below;
Office of the Project Director,GNP-3, LGED Bhaban, Agargaon, Dhaka

PCC--G. Claims, Disputes and Arbitration--

The Adjudicator jointly appointed by the parties is:
Name:
Address:
Tel No:
Fax No:
e-mail address:

 

In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. 

The Adjudicator jointly appointed by the parties is:
Name: Rubaiyat Nurul Hasan
Address: Kapotaskha Chhayapath, B-3, 16/A/6, Ring Road, Mohammadpur, Dhaka-1207.
Tel No:
Fax No:
e-mail address:


In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Engineers Bangladesh (IEB), Bangladesh.

TDS/PDS--A. General--

The PE is [state name of PE]

 

The Name of the Tender is:
Brief Description of the Works:

Tender Ref:

Lot No(s):

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

The PE is
The Executive Engineer
Local Government Engineering Department
District: Noakhali

 

The Name of the Tender is: GNP-3/NOA/CHA/18-19/W-137
A. i Improvement of Bansha-Horipur Megha road Nischintapur Saw mill-Sofique Miah bari road. at Ch.1576-2076m . ID No. 475104035 A. ii Providing 100.00m Palisading work B.i Improvement of Razzakpur Torab bepari road Ailerpukur Razzakpur Eidgaon road Kalu Chowdhury road-Dristinandon road at Ch.00-457m . ID No. 475105110 B.ii Providing 150.00m Palisading work Value of Recovered Material58205.05 C.i Improvement of Hirapur Community Clinic Dristinandon road at Ch.00-500m . ID No. 475105308 C.ii Providing 76.00m Palisading workC.iii Construction of 1No U-Drain Culvert at Ch.10m. under Upazila-Chatkhil District-Noakhali
 

Brief Description of the Works: Earthworks, ISG, Sub-base, base-course, Dense Carpeting,Construction, Palisading and Protection work.etc.

 

Tender Ref:APP ID : 139838

 

Lot No(s): 01

TDS/PDS--A. General--

The source of public funds is

[state source, GoB or other source of funds].
 

 

The source of public funds is GoB

TDS/PDS--A. General--

The name of the Development Partner is

[state name of Development Partner]
 

Tenderers from the following countries are not eligible

Israel

TDS/PDS--A. General--

Tenderers from the following countries are not eligible

[ state countries, if any ]
 

Tenderers from the following countries are not eligible

Israel

TDS/PDS--A. General--

Materials, Equipments and associated services from the following countries are not eligible:

[state countries, if any]
 

Materials, Equipments and associated services from the following countries are not eligible:

Israel

TDS/PDS--B. e-Tender Document (e-TD)--

Allowed to post clarification till [Date and Time]

Allowed to post clarification : Not Applicable

TDS/PDS--B. e-Tender Document (e-TD)--

A Pre-Tender meeting shall not be held
or
A Pre- Tender meeting shall be held through e-GP System

[delete whichever is not applicable]
 

A Pre- Tender meeting shall be held through e-GP System

TDS/PDS--B. e-Tender Document (e-TD)--

Pre- Tender meeting [Date & Time]

Pre- Tender meeting is stated in Tender Notice

TDS/PDS--C. Qualification Criteria--

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [state number] years.

[a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].

[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
 

[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package]
[the minimum value of the similar works is recommended to be between 50 and 75 percent of the estimated cost of the proposed work]

 

( a ) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 (Five) years.

( b ) A satisfactory completion of similar works of at least Tk 10300000.00 (One Crore Three Lakh Only) under max. 4 (four) numbers of contracts over a period of last 10 (ten) years shall be required. (years counting backward from the date of publication of IFT in the newspaper)


-The requirement of experience shall not be separately applicable for each individual lot/package
- Authenticated by completion certificate issued by relevant procuring entity(ies)

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

  

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

a) The required average annual construction turnover shall be greater than Tk.6400000.00 (Sixty Four Lakh Only) best 5(five) years over the last 10 (ten) years. (years counting backward from the date of publication of IFT in the newspaper)


-Tenderer shall demonstrate the resources sufficient to meet the aggregate ofthe value for the individual contracts/contractual commitments, incase, participation is more than one package/lot from same procuring entity and
other procuring entity (ies).
- Apart from payment received for construction works, the certified public works in progress (financial progress) or completed year wise by relevant procuring entity (ies) will be considered as construction turnover.

(b) The minimum amount of liquid assets ie. banking instrument or working capital or credit facilities or credit line of the Tenderer shall be Tk 3900000.00 (Thirty Nine Lakh Only)
-Tenderer shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, in case, participation is more than one package/lot from same procuring entity and other procuring entity (ies).
-Banking instrument - authenticated by statement , savings scheduled bank.
-Working capital - authenticated by recent past Audit Reports
-Credit facilities- authenticated by credit sanctioned letter and credit account
-Credit line - authenticated by any scheduled bank In the format as specified
-Banking instrument, statement of Credit facilities and Credit line issued not earlier than 28(twenty eight) days prior to the day of the original deadline for submission of Tenders for this Contract.

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:[70%-80% of the official estimated cost]
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

 

The minimum capacity shall be:at least Tk 10300000.00 (One Crore Three Lakh Only)

TDS/PDS--C. Qualification Criteria--

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:

 

No Position Total Works Experience (years) In Similar
Works
Experience
(years)
 
       
       
       
       
       
       

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

[ qualification of an alternative Construction Project Manager may also be requested]
[ for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package]
 

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:

 

No Position Nos. Education Total Works Experience (years) In Similar
Works
Experience
(years)
 
1 Construction Project Manager 1 BSc. Eng.(Civil) or
Diploma Engr.(Civil)
5 (Five) or
10 (Ten)
3(Three) or
5 (Five)
2 Quality Control & Material Engineer 1 B.Sc. Engineer or Diploma Engineer 3 (Three) 3 (Three) or
6 (Six)
3 (Three) or
4 (Four)
3 Quality Control & Material Engineer
Site Manager
1 Diploma in Civil Engg/HSCv 3 (Three) or
6 (Six
05 (Five)
3 (Three)

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

TDS/PDS--C. Qualification Criteria--

Tenderer shall own or have proven access to hire or lease of the major construction  equipments, in full working order as follows :

 

No Equipment Type and Characteristics Minimum Number
Required
 
     
     
     
     
     
     

 

 [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary  for each lot in the package, subject to the nature of the control required over each package]

Tenderer shall own or have proven access to hire or lease of the major construction  equipments, in full working order as follows :

 

No Equipment Type and Characteristics Minimum Number
Required
 
1 Static Road Roller of 8-10 ton capacity 1
2 Truck of capacity 200 cft. 1
3 Bitumen plant 1
4 Bitumen distributor 1
5 Mixture machine with Hopper (7 cft.) 1
6 2 HP Diesel pumpPlate Compactor 1
7 Plate Compactor 1

 

TDS/PDS--C. Qualification Criteria--

The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows :

[it is suggested that the PE adheres to the above proportion of minimum qualifying requirements to meet the specific procurement needs. Percent share of business of the JVCA partners shall not be taken into account in determining the qualification of a JVCA]
 

The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows :

As stated on the 19.1

TDS/PDS--C. Qualification Criteria--

 

TDS Clauses References Requirements by summation Requirements for Lead Partner of JVCA Requirements for other Partner(s) of JVCA
ITT-15.1(a) Summation not applicable Same as stated in TDS Same as for
Leading Partner
 
ITT-15.1(b) 100% At least one Contract Minimum requirement not applicable
ITT-16.1(a) 100% 40% 25%
ITT-16.1(b) 100% 40% 25%
ITT-17.1 100% Minimum requirement not applicable Minimum requirement not applicable
ITT-18.1 100% Minimum requirement not applicable Minimum requirement not applicable

 

The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk [state amount]
[the value of the non-judicial stamp shall be Tk.300.00]
 

 

TDS Clauses References Requirements by summation Requirements for Lead Partner of JVCA Requirements for other Partner(s) of JVCA
ITT-15.1(a) Summation not applicable Same as stated in TDS Same as for
Leading Partner
 
ITT-15.1(b) 100% At least one Contract Minimum requirement not applicable
ITT-16.1(a) 100% 40% 25%
ITT-16.1(b) 100% 40% 25%
ITT-17.1 100% Minimum requirement not applicable Minimum requirement not applicable
ITT-18.1 100% Minimum requirement not applicable Minimum requirement not applicable

 

The value of the non-judicial stamp shall be Tk.300.00

TDS/PDS--C. Qualification Criteria--

The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works:


[state the components of the proposed works ; if not applicable state ‘none’]
 

The Nominated Subcontractor(s) of the proposed Works: None

TDS/PDS--D. Tender Preparation--

The Tenderer shall submit with its Tender the following additional documents:


[in case of purchase of capital equipment by the Contractor as part of the overall Contract, a Performance Statement of the capital equipment in Bangladesh may be necessary and may be requested. if no other documents are required then specify “none”]

 

The Tenderer shall submit with its Tender the following additional documents:
• Valid Trade Licence;
• VAT Registration;
• TIN Number;
• Nationality Certificate;
• Business Address;

The Tender Validity period shall be 120 days.

TDS/PDS--D. Tender Preparation--

The prices quoted by the Tenderer shall be fixed for the duration of the Contract.
OR
The prices quoted by the Tenderer shall be adjustable as follows:

Iif prices shall be adjustable, the methodology for adjustment should be specified]
 

The prices quoted by the Tenderer shall be fixed for the duration of the Contract

TDS/PDS--E. Tender e-Submission--

The deadline for lodgement of e-Tenders is [state time, and identify a.m or p.m, i.e 10.30 a.m]


[state date i,e. 15 june,2011 ].
 

Deadline for submission of e-Tender is stated in Tender Notice

TDS/PDS--G. Contract Award--

The amount of Performance Security shall be [state percentage] percent of the Contract Price.

[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ]
 

The amount of Performance Security shall be 05% (Five) percent of the Contract Price. Maximum 25% ( twenty five percent ) of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading according to ITT Clause no. 49.7

The amount of Tender Security shall be Tk. Stated in Tender Notice

 