Condition given vide memo no. 215 CE, RHD, dated 06.08.2017
As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with the help of online database system- TDMS. Qualification information and evidence (such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list ( own or rented), personnel list etc.) of the Tenderers as mapped in the eGP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time. If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail. A Tenderer not having sufficient information in the TDMS system may be evaluated as ineligible. Evaluation Sheet generated by TDMS shall be uploaded into the e-GP system by the TEC. Tenderers must upload rate analysis in support of their quoted rates if the total quoted price is more than 5.00% above/less of the engineers estimate. A satisfactory completion of similar works at least Tk. 13.00 Lac under single of contract(s) over a period of 05 years shall be required. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 18.00 Lac. The required average annual construction turnover shall be greater than Tk 16.000 Lac's over the last 5 years The minimum Tender Capacity shall be Tk. 16.00 Lac's Tender Capacity Calculation sheet must be submited by the Tenderes
Retender
Engineers Estimate of works for Supplying materials at different Road of Road- Sub-Divison-2 under Coxs Bazar Road Division during the year-2019-2020 (Re-Tendered)