Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Change of Tender Data Sheet -2: ITT Clause 9. Experience Criteria. |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- |
1. A satisfactory completion of similar works of Building at least Tk. 69,00,00,000.00 under a single contract over the period of last Five (5) years shall be required. [years counting backward from the date of publication of IFT in the newspaper] 2. Tenderer shall have the minimum level of personnel capacity to qualify for the performance of the Works under the Contract consisting of a Construction Project Manager, Engineers, and other key staff with qualifications and experience as specified below: a) 01 No. of Project Manager (B.Sc in Civil Engg.) Or Project Manager (Diploma in Civil Engg). b) 01 No. of Supervisor. c) 01 No. of Surveyor. 3. Tenderer shall own suitable equipment and other physical facilities or have proven access through contractual arrangement to hire or lease such equipment or facilities for the desired period, where necessary or have assured access through lease, hire, or other such method, of the essential equipment, in full working order: a) 01 No. of Vibromax Roller, c) 01 No. of Excavator, g) 01 No. of Dump Truck, h) 01 set Survey Equipment. |
1. A satisfactory completion of similar works at least Tk. 69,00,00,000.00 under a single contract over the period of last Five (5) years shall be required. [years counting backward from the date of publication of IFT in the newspaper] 2. Tenderer shall have the minimum level of personnel capacity to qualify for the performance of the Works under the Contract consisting of a Construction Project Manager, Engineers, and other key staff with qualifications and experience as specified below: a) 01 No. of Project Manager (B.Sc in Civil Engg.) Or Project Manager (Diploma in Civil Engg). b) 01 No. of Supervisor. c) 01 No. of Surveyor. 3. Tenderer shall own suitable equipment and other physical facilities or have proven access through contractual arrangement to hire or lease such equipment or facilities for the desired period, where necessary or have assured access through lease, hire, or other such method, of the essential equipment, in full working order: a) 01 No. of Vibromax Roller, c) 01 No. of Excavator, g) 01 No. of Dump Truck, h) 01 set Survey Equipment. |