| Eligibility of Consultant
|
Special Instructions:
1. Only e-GP registered tender/Firms can participate to the Tender.
2. Tenderer should fulfill all criterias which are stated in TDS.
3. Tenderer should submit their credit line facility/Liquid assets certificate according to attached format (From PW2a-3). Credit line facility certificate format is attached in section-7 in TDS. Without credit line facility/Liquid assets certificate according to attached format tender declare a non-responsive.
4. Payment will be made upon availability of fund and after BWDB Pre & Post work Measurement. For this no claim will entertain.
5. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
6. After completion the tender opening process. If disable to download the important documents of the tender. Which consider to tender evaluation. In order to the tender may be treated as non-responsive.
7. The Tenderers will visit and examine the site with his own responsibility & expenses and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works.
8. Latest GoB circular on procurement of works will be applicable.
9. Evaluation will be done on the basis of the past performance Evaluation matrix. So, authenticated information along with documents will have to be incorporated with the tender. Planned & Actual start/commencement & completion date will have to clearly mentioned in the work certificate.
10. Arrangement of land or working area (if any) need to be made by the tenderer and no claim in this regard will be entertained. Also the work will be completed by tenderer of his own management of site.
11. The authority reserves the right to accept or reject any/all tender(s) without showing any reason.
|
Special Instructions:
1. Only e-GP registered tender/Firms can participate to the Tender.
2. Tenderer should fulfill all criterias which are stated in TDS.
3. Tenderer should submit their credit line facility/Liquid assets certificate according to attached format (From PW2a-3). Credit line facility certificate format is attached in section-7 in TDS. Without credit line facility/Liquid assets certificate according to attached format tender declare a non-responsive.
4. Payment will be made upon availability of fund and after BWDB Pre & Post work Measurement. For this no claim will entertain.
5. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive.
6. After completion the tender opening process. If disable to download the important documents of the tender. Which consider to tender evaluation. In order to the tender may be treated as non-responsive.
7. The Tenderers will visit and examine the site with his own responsibility & expenses and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works.
8. Latest GoB circular on procurement of works will be applicable.
9. Evaluation will be done on the basis of the past performance Evaluation matrix. So, authenticated information along with documents will have to be incorporated with the tender. Planned & Actual start/commencement & completion date will have to clearly mentioned in the work certificate.
10. Arrangement of land or working area (if any) need to be made by the tenderer and no claim in this regard will be entertained. Also the work will be completed by tenderer of his own management of site.
11. The authority reserves the right to accept or reject any/all tender(s) without showing any reason.
|
| TDS/PDS--C. Qualification Criteria--
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five) years.
[Years counting backward from the date of publication of IFT in the newspaper and e-GP web portal]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(Five) years, each with a value of at least Tk. 450.00(Four Hundred Fifty) Lac.
[Years counting backward from the date of publication of IFT in the newspaper and e-GP web portal]
01. Similar works should be the following tpes of works-
a) Earthwork by Mechanical Excavator ( Long Boom) in constructing/re-sectioning of embankment/canal bank/road etc.
b) Earthwork by Manual Labour in constructing/re-sectioning of embankment/canal bank/road etc.
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(Five) years.
[Years counting backward from the date of publication of IFT in the newspaper and e-GP web portal]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(Five) years, each with a value of at least Tk. 450.00(Four Hundred Fifty) Lac.
[Years counting backward from the date of publication of IFT in the newspaper and e-GP web portal]
01. Similar works should be the following tpes of works-
a) Earthwork by Mechanical Excavator ( Long Boom) in constructing/re-sectioning of embankment/canal bank/road etc.
b) Earthwork by Manual Labour in constructing/re-sectioning of embankment/canal bank/road etc.
Corrigendum in ITT Clause 15.1(b).
Previous Similar Works experience will be replaced by the Present Similar Work experience given below:
Similar works should be the following types of work:
a). Earth work by Mechanical Excavator ( Long Boom ) in all kinds of soil in excavation/ re-excavation of River/channel /canal/khal etc.; or
b). Earth work by Mechanical Excavator (Long Boom) in constructing/re-sectioning of embankment/canal bank/canal dyke etc. [Earth work by Mechanical Excavator (Long Boom) with manual labour in constructing/ re-sectioning of embankment/ canal bank/ canal dyke etc. will be preferable].
|
| Brief Description of Goods,Works or Service
|
Re-Sectioning of Tulshiganga Right Embankment From km. 0.000 to Km. 15.900= 15.900 Km. in C/W “Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabati River of Joypurhat District” Project during the FY: 2019-2020.
a) Earth work by Mechanical Excavator (Long Boom) in constructing/resectioning of embankment/canal bank/dyke etc.
b) Earth work by manual labour in constructing/ resectioning of embankment/ canal bank/ dyke etc.
c) Turfing Work
|
Re-Sectioning of Tulshiganga Right Embankment From km. 0.000 to Km. 15.900= 15.900 Km. in C/W “Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabati River of Joypurhat District” Project during the FY: 2019-2020.
a) Earth work by Mechanical Excavator (Long Boom) in constructing/resectioning of embankment/canal bank/dyke etc.
b) Earth work by manual labour in constructing/ resectioning of embankment/ canal bank/ dyke etc.
c) Turfing Work
|