Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum-01 |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Completion Date(Lot No : 1) | 15/03/2020 | 30/06/2020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Document last selling date & time | 11/12/2019 15:30 | 17/12/2019 15:30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Eligibility of Consultant | All tenderers in Bangladesh registered in National e-GP System, who fulfills the qualification criteria as specified in the Tender Data Sheet (TDS) of the Tender Document. |
All tenderers in Bangladesh registered in National e-GP System, who fulfills the qualification criteria as specified in the Tender Data Sheet (TDS) of the Tender Document. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opening Date & Time | 12/12/2019 12:15 | 18/12/2019 12:15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The PE is
|
The PE is
Global Affairs Canada (GAC) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The Works consist of construction of wash block in primary schools. This tender includes new construction of Wash Block and repair and maintenance of previously constructed Wash Block in all upazila of Kurigram district. |
Construction of 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works at different primary School in Kurigram. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
The minimum insurance cover shall be:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- |
Other documents forming part of the Contract are: |
Other documents forming part of the Contract are: |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--D. Cost Control-- |
The proportion of payments to be retained is ten (10) percent. |
The proportion of payments to be retained is 10 (Ten) percent from each progressive payment & also from final account (Total final billed amount).i.e. Retention money is to be |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.10 of ONE (1) percent ] percent of its Contract price per day of delay.
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Works. |
The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.01 (zero point zero one) percent of its Contract price per |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 12/12/2019 11:30 | 18/12/2019 11:30 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Start Date(Lot No : 1) | 15/12/2019 | 01/01/2020 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Closing Date & Time | 12/12/2019 12:15 | 18/12/2019 12:15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- |
The Development Partners are: |
The name of the Development Partner is ADB, IDA, DFID, JICA, UNICEF, EU, GAC, GFAT |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- |
The source of public funds is GoB |
The source of public funds is GOB & Development Partners (DPs) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- | Pre- Tender meeting : As per Notice. |
Pre-Tender meeting will be held online on the date and time as specified in IFT. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be: 65 Lakh.
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be: 70%
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk [state amount] |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents:
|
Tenderer shall submit with its Tender, the following additional documents: 1. Valid trade licence. 2. TIN Certificate. 3. VAT & IT Certificate.
4. Litigation History (if any) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender e-Submission-- | The deadline for lodgement of e-Tenders is Date : 12-Dec-2019 12:15 p.m |
The deadline for lodgement of e-Tenders is no later than the date and time specified in the IFT. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The amount of Performance Security shall be [state percentage] percent of the Contract Price.
[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ] |
The amount of Performance Security shall be 05 (Five) to 10 (Ten) percent of the Contract Price. However, PE reserves the right to increase the performance security based on the |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Construction of 05 (Five) Nos. 2 (Two) storied RCC WASH Block having 4 (Four) storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Primary Education Development Program-4 (PEDP-4) at different primary School in Kurigram. FY 2019-20 (Location & Position of WASH Block might be change on the demand of the sites which depends on Procuring Entity. No objection will grant for this purpose.) |
Construction of 05 (Five) Nos. 2 (Two) storied RCC WASH Block having 4 (Four) storied foundation for MT & boys and FT & girls including all associated construction sanitary plumbing & electrical works under Primary Education Development Program-4 (PEDP-4) at different primary School in Kurigram. FY 2019-20 (Location & Position of WASH Block might be change on the demand of the sites which depends on Procuring Entity. No objection will grant for this purpose.) |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | General Specifications.pdf | General Specifications | 485352 | ||
| 2 | Particular Conditions of Tender and Contract.pdf | Particular Conditions of Tender and Contract | 1208460 | ||
| 3 | PEDP4_WB_Drawing.pdf | PEDP4_WB_Drawing | 379350 | ||