As specified in the TDS.
Jamuna River Dredging Work from Km. 0.800 to Km. 1.550 = 0.750 Km. at Kaolibari area in c/w River Bank Protection Project along the Left Bank of Jamuna River from Kaolibari Bridge to Shakharia (Varua-Bottola) (1st Revised) in Gopalpur upazila during the year 2019-20.