As specified in the TDS.
Jamuna River Dredging Work from Km. 1.550 to Km. 2.500 = 0.950 Km. at Kaolibari area in c/w River Bank Protection Project along the Left Bank of Jamuna River from Kaolibari Bridge to Shakharia (Varua-Bottola) (1st Revised) in Gopalpur upazila during the year 2019-20.