View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to correction of TDS |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk. 27000000.00 (Two Crore Seventy Lac) over the last 5 (Five) years. The minimum amount of liquid assets or working capital or credit facilities or Line of credit of the Tenderer shall be Tk. 7000000.00 (Seventy Lac).
NOTE-1: â?¢ 1. Working capital: Authenticated by Audit Report not earlier than FY 2018-19. â?¢ 2. Credit line: Authenticated by any scheduled bank shall be furnished unconditional credit line without alteration in accordance with the format as specified in the Form PW3-7 ( Attached to section 8). 3. Credit facilities: Authenticated by credit sanctioned letter and bank statement of the credit account issued not earlier than 28 days prior to the day of the original deadline for submission of Tenders for this Contract.
â?¢ 4. Bank Balance: Authenticated by bank statement with day-end closing balance from any scheduled bank issued not earlier than 28 days prior to the day of the original deadline for submission of Tenders for this Contract. |
The required average annual construction turnover shall be greater than Tk. 27000000.00 (Two Crore Seventy Lac) over the last 5 (Five) years. The minimum amount of liquid assets or working capital or credit facilities or Line of credit of the Tenderer shall be Tk. 7000000.00 (Seventy Lac).
NOTE-1: • 1. Working capital: Authenticated by Audit Report not earlier than FY 2018-19. • 2. Credit line: Authenticated by any scheduled bank shall be furnished unconditional credit line without alteration in accordance with the format as specified in the Form PW3-7 ( Attached to section 8). 3. Credit facilities: Authenticated by credit sanctioned letter and bank statement of the credit account issued not earlier than 28 days prior to the day of the original deadline for submission of Tenders for this Contract.
• 4. Bank Balance: Authenticated by bank statement from any scheduled bank issued not earlier than 28 days prior to the day of the original deadline for submission of Tenders for this Contract. |