View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Document correction. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As per TDS. |
As per TDS. |
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 (Five) years. Years counting backward from the date of publication of IFT in the newspaper The minimum specific experience as a Prime Contractor in construction works of at least 01 (One) contract(s) of similar nature successfully completed within the last 05 (Five) years, each with a value of at least Tk. 23000000.00 (Two Crore thirty Lakh Taka Only). |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 (Five) years. Years counting backward from the date of publication of IFT in the newspaper The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05 (Five) years, each with a value of at least Tk. 19100000.00 (One Crore ninety one Lakh Taka Only). |
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:Not Applicable.
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be:Tk. 23000000.00 (Two Crore thirty Lakh Taka Only). |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk. 50000000.00 (Five crore taka only) over the last 05 (Five) years.
NOTE: The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk . 8000000.00 (Eighty lakh taka only). Supporting necessary documents required are as fllows: -Banking instrument -authenticated by bank statement ,savings instrument from any scheduled bank.(Day end balance for Bank statement) -Credit facilities:authenticated by credit sanctioned letter and bank stetement of the credit account.(Un-Conditional) -Credit line : authenticated by any scheduled bank shall be furnished in accordance with the format as specified in the Form, ’’Letter of Commitment for Bank’s Undertaking of Credit’’ without alteration.(Un-Conditional) -Banking instrument ,statement of Credit Account and Line of Credit issued not earlier than 28 (twenty eight) days prior to the day of the original deadline for submission of Tender for this Contract. |
The required average annual construction turnover shall be greater than Tk. 50000000.00 (Five crore taka only) over the last 05 (Five) years.
NOTE: The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk . 8000000.00 (Eighty lakh taka only). Supporting necessary documents required are as fllows:
-Tenderer shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, in case, participation is more than one package/lot from same procuring entity at respective notice |
| Brief Description of Goods,Works or Service | JRRIDP/19/JND/W-32 |
JRRIDP/19/JND/W-32 |