A.The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 01(one) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 05(five) years, each with a value of at least Tk. 7600000
B.The required average annual construction turnover shall be greater than Tk 10100000 over the last 05(five) years.
C.The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 3000000
D.The minimum capacity shall be: tk 7600000
Construction of additional class room Chengapara GPS under PEDP4