View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Notice Change |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As per TDS and ITT
1. Similar nature of work : TK 1,19,00,000/= 6. VAT & IT from bill will be as per prevailling Government Rate. No extra claim will be entertained in this regard. |
As per TDS and ITT
1. Similar nature of work : TK 1,19,00,000/=
6. VAT & IT from bill will be as per prevailling Government Rate. No extra claim will be entertained in this regard. |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than TK 57,00,000/= over the last 5 years. |
The required average annual construction turnover shall be greater than TK 57,00,000/= ( Over the Best 3 Years in the Last 5 Years ) |
| TDS/PDS--E. e-Tender Submission-- | The deadline for lodgment of e-Tenders is 05-Mar-2020 11:20 |
The deadline for lodgment of e-Tenders is 09-Mar-2020 11:10 |
| Brief Description of Goods,Works or Service | KCC/DIDRRR/XEN-3/2019-20/W-88 Repair of Golam Muktadeer Sarak. (M.ABari Sarak to Hazi Ismail Link Road) Dismantling damaged structural works in bridge/culvert and removing Dismantling of existing/ damaged structures like culverts, bridges, retaining walls Earthwork Sand (FM 0.50) filling Providing and laying polythene sheet (0.18mm thick) Plain cement concrete work RCC:1:1.5:3 Providing compacted aggregate sand sub-base course RCC Supplying and fabrication of Ribbed Providing cork sheet/polythene sheet bitumen
Note: Recovered (Salvage) material price BDT 39039.00/- will be deduct from final payable bill of contructor. |
KCC/DIDRRR/XEN-3/2019-20/W-88 Repair of Golam Muktadeer Sarak. (M.ABari Sarak to Hazi Ismail Link Road) Dismantling damaged structural works in bridge/culvert and removing Dismantling of existing/ damaged structures like culverts, bridges, retaining walls Earthwork Sand (FM 0.50) filling Providing and laying polythene sheet (0.18mm thick) Plain cement concrete work RCC:1:1.5:3 Providing compacted aggregate sand sub-base course RCC Supplying and fabrication of Ribbed Providing cork sheet/polythene sheet bitumen
Note: Recovered (Salvage) material price BDT 39039.00/- will be deduct from final payable bill of contructor. |