Any tenderer(s) who fulfill the requirements stated in TDS. The Tenderer with a poor performance, consistent history of litigation or arbitration awards against it shall not be eligible to tender. * During evaluation if the quoted rate by any tenderer is found more than 5(Five) percent less/above than the Official Estimated price, then it is mandatory to submit Rate Analysis when asked by the Procuring Entity according to Memo No- 35.00.0000.015.14.105.19-596 Dated-03.11.2019 of Maintenance Wing, Road Transport & Highways Division, Ministry of Road Transport & Bridges. * 60/70 Grade Bitumen shall be used in all DBS Wearing Course and DBS Base Course works in this project. * For preparation of DBS materials Asphalt Batching Plant must be used by the contractor. * The tenderers shall have their own Asphalt Batching Plant. If the tenderers do not have their own Asphalt Batching Plant they may hire it from any other source; But then the tenderers have to submit the contractual agreement to hire or lease of the Asphalt Batching Plant in non-judicial stamp of Tk. 300 affidavit by the notary public. * The Additional Chief Engineer, RHD, Chattogram Zone will visit the plant during evaluation process to verify the location and condition of the plant. * The Defects Liability Period is 1095 Days
Emergency Repair of Damaged Pavement and Surfacing by DBS Wearing Course at different location ( Ch: 24+000-24+100, 38+700-41+100, 42+250-48+500, 49+000-50+100, 50+300-51+100, 51+350-57+000) of Patiya-Anowara-Banshkhali-Toitong Road (R-170) under Dohazari Road Division during the year 2019-2020.