1)As described in tender document .
2) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be five (5) years
3) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 5 (five) years, with a value of at least Tk.470.00 Lac
4) The required average annual construction turnover shall be greater than 900.00 Lac over the last 5 (five) years. [2010-11, 2011-12, 2012-13, 2013-14, 2014-15]
5) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk.210.00 Lac.
a) Improvement of road By BC from Khatkhtia Kali Mondir to H/O Shamol Dargi at Taltola.Ch 0- 2.0 km (Improvement of road By BC from KhatKhatia Kali Mondir to Shop of Jalil Member. Ch.-0.0-1.1 km; Link-1, Khotkhatia Eid Gha to H/O Shahidar, Ch.-0.0-0.4 km, Link-2, Khotkhotia Shirajul�????�???�??�?�¢??s Shop to H/O Shankar Ray, Ch.-0.0-1.42 Km. Including Box Culvert 1.5 �?????? 1.0m at (Ch. 620.0m, Ch. 840.0m, Link 1 Ch. 240.0m, Link 2 Ch. 600.0m) b) Improvement of road by BC from Bala Komor Shop of Majedul to Balakomor Road.Ch 0- 1.5 km (Improvement of road by BC from Bala komor Road to Shop of Majedul. Ch.0.0-0.86 km; Link-1, Sharak-er-Par Shop of Nibaron to Bala Komor Road. Ch.-0.0-0.45 km; Link-2, Chowdhary Bazar to Bakomor Road. Ch.0.0-0.335km) c) Improvement of road by BC from Chilar Jhar H/O Moshiar to Harati Primary school more. Ch 0- 1.2 km (Improvement of road by BC from Chilar Jhar H/O Moshiar to Harati Primary school more. Ch 0-1.10 km; Link- Shop of Moshiar to H/O Taiub Ali. (Ch.-0.0-.988Km) d) Improvement of road by BC from Burail H/O Motiul to Gojoghonta road. Ch 0- 3.0 km (Improvement of road by BC from Burail H/O Motiul to Gojoghonta road. Ch 0-2.982 km; Link- H/O Kazi Moulovi Md. Saiful Islam to shop of Atiar Rahman Ch.-0.0-0.62km) Including Box Culvert 1.5m �?????? 1.0m at (Ch.220.0m, Ch.860.0, Ch.1860.0, Ch.2290.0 Link Ch. 180.0m, Link Ch. 580.0m)