View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Correction in PCC |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant |
|
|
||||||||||||||||||||||||||||
| PCC--A. General-- |
The Contractor is |
The Contractor is |
||||||||||||||||||||||||||||
| PCC--A. General-- |
The PE is |
The PE is DPHE Rajshahi |
||||||||||||||||||||||||||||
| PCC--A. General-- |
The Site is located at [location] and is defined in drawings No: |
The Site is located at [location] and is defined in drawings No: |
||||||||||||||||||||||||||||
| PCC--A. General-- | The Start Date shall be [insert date ]
[it is the last date when the Contractor shall commence execution of the Works under the Contract reasonably immediately after the Commencement Date; refer to GCC Clause 40] |
The Start Date shall be 7days after signing the contrac |
||||||||||||||||||||||||||||
| PCC--A. General-- | The Works consist of [state brief summary, including relationship to other Contracts under the Project] |
The Works consist of Boring of TW Installation of SP Basin construction |
||||||||||||||||||||||||||||
| PCC--A. General-- | The original Contract price is [insert the amount in the NOA] |
The original Contract price will be specified in the NOA |
||||||||||||||||||||||||||||
| PCC--A. General-- |
The Project Manager is
|
The Project Manager is
|
||||||||||||||||||||||||||||
| PCC--A. General-- |
The PE is The Development Partner is [Name of the DP] |
The PE is EE,DPHE,Rajshahi
The Development Partner is
AsianDevelopment Bank (ADB) |
||||||||||||||||||||||||||||
| PCC--A. General-- | Nominated Subcontractor(s) named below;
____[insert name(s)]___________________________________________
[state none ,if not applicable] |
Nominated Subcontractor(s) named below;
_ none , |
||||||||||||||||||||||||||||
| PCC--A. General-- | The Contractual matters between the PE and the Contractor shall be decided by
[state only if other than the Project Manager] |
The Contractual matters between the PE and the Contractor shall be decided by
N/A |
||||||||||||||||||||||||||||
| PCC--A. General-- |
The PEâ??s address for the purpose of communications under this contract is :
|
The PE’s address for the purpose of communications under this contract is : Executive Engineer DPHE, Rajshahi phone: 774987 email: dpherajshahi@gmail.com
|
||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
T The minimum insurance cover shall be: The maximum deductible for insurance of the Works and of Plant and Materials is N/A
The minimum cover for insurance of the Works and of Plant and Materials in respect of the Contractor’s faulty design is N/A
[the amount could be 110% of the value of the works, plant and materials that may be lost in a worst case scenario]. The maximum deductible for insurance of Equipment is N/A
The minimum cover for loss or damage to Equipment is N/A
[the amount could be 110% of the replacement value of the equipment] The maximum deductible for insurance of other property is N/A
[the Contractor shall state this amount at the time of Contract signing]. The minimum cover for insurance of other property is N/A
The minimum cover for personal injury or death insurance:
|
||||||||||||||||||||||||||||
| PCC--A. General-- | Other documents forming part of the Contract are;
[list other documents viz. Schedule of other contractors, Schedule of Key Personnel, Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.] |
Other documents forming part of the Contract are; general and perticular specification |
||||||||||||||||||||||||||||
| PCC--A. General-- | A Contractor or a Subcontractor that is a national of, or registered in, the following countries are not eligible:
[state countries, if applicable] |
A Contractor or a Subcontractor that is a national of, or registered in, the following countries are not eligible:
Israel |
||||||||||||||||||||||||||||
| PCC--A. General-- | Materials, Equipments Plants and supplies shall not have their origin in the following countries:
[state countries, if applicable] |
Materials, Equipments Plants and supplies shall not have their origin in the following countries: Israel |
||||||||||||||||||||||||||||
| PCC--B. Time Control-- | Commencement Date of Works shall be as follows;
[insert different commencement dates for different parts of the Works, if deemed appropriate] |
Commencement Date of Works shall be as follows; within 7(seven) days from the date of contract signing |
||||||||||||||||||||||||||||
| PCC--B. Time Control-- | The amount to be withheld for late submission of an updated Programme is [state amount]. |
The amount to be withheld for late submission of an updated Programme is [state amount]. N/A |
||||||||||||||||||||||||||||
| PCC--B. Time Control-- | The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.
[usually fifteen (15) days] |
The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.
N/A |
||||||||||||||||||||||||||||
| PCC--B. Time Control-- | The period between Programme updates is [state interval]
[usually bi-monthly or quarterly depending on the nature of the Works] |
The period between Programme updates is [state interval] N/A |
||||||||||||||||||||||||||||
| PCC--C. Quality Control-- | The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season]. |
The Defects Liability Period is [state months]
24 months |
||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The particulars of the Bank Account nominated are as follows :
Title of the Account : [insert title to whom the Contract awarded]
[information furnished by the Contractor shall be substantiated by the concerned Bank and authenticated by the PE] |
The particulars of the Bank Account nominated are as follows : N/A
Title of the Account : [insert title to whom the Contract awarded]
[information furnished by the Contractor shall be substantiated by the concerned Bank and authenticated by the PE] |
||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The following additional events shall also be the Compensation Events:
|
The following additional events shall also be the Compensation Events:
|
||||||||||||||||||||||||||||
| PCC--D. Cost Control-- |
The Contract is not subject to price adjustment.
[Price Adjustment Formulae to be applicable if stated under ITT Sub Clause 27.10 shall be specified here]
[insert figure] non-adjustable component (coefficient A)
[price adjustment clauses are usually only permitted for Works Contracts, execution of which will take more than eighteen (18) months from Start Date to Completion Date. The PE must consider each Contract on its individual merit; approval of HOPE required for Contracts of less than eighteen (18) months] |
The Contract is not subject to price adjustment. |
||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The proportion of payments to be retained is [insert percent] percent.
|
The proportion of payments to be retained is 10 percent. |
||||||||||||||||||||||||||||
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
|
The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.05 percent of its Contract price per day of delay.
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Works. |
||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The percentage for adjustment of Provisional Sums is
____% (_________percent) |
The percentage for adjustment of Provisional Sums is
none, |
||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The amount to be withheld for failing to produce â??as-builtâ?� drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]
[usually a very nominal amount] |
The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]
[usually a very nominal amount] N/A |
||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The date by which â??as-builtâ?� drawings are required is [insert date]
The date by which operating and maintenance manuals are required is [insert date] |
The date by which “as-built” drawings are required is [insert date]
The date by which operating and maintenance manuals are required is [insert date] N/A |
||||||||||||||||||||||||||||
| PCC--F. Termination and Settlement of Disputes-- | The percentage to apply to the contract value of the works not completed, representing the PEâ??s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is ten (10)percent. |
||||||||||||||||||||||||||||
| PCC--G. Claims, Disputes and Arbitration-- |
The Adjudicator jointly appointed by the parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. |
The Adjudicator jointly appointed by the parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the Secretary, Local Government Division, Ministry of Loacal Government, Rural
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. |
||||||||||||||||||||||||||||
| PCC--G. Claims, Disputes and Arbitration-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below;
The arbitration shall be conducted in the place mentioned below; |
||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Installation of 50 nos. 100 mm dia Tube well with submersible pumpCapacity 1.5 HP with RO filter at different primary schools of Rajshahi District under PEDP4 during FY 2019-20 *Tenderers are requested to quote the rates in a manner justified and relevant to the execution of works *Performence secuirity will be impose upto 25% due to quated abnormal less than the estimated cost |
Installation of 50 nos. 100 mm dia Tube well with submersible pumpCapacity 1.5 HP with RO filter at different primary schools of Rajshahi District under PEDP4 during FY 2019-20 *Tenderers are requested to quote the rates in a manner justified and relevant to the execution of works *Performence secuirity will be impose upto 25% due to quated abnormal less than the estimated cost |