Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Liquid asset correction |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 13/05/2020 16:00 | 17/05/2020 16:00 |
| Opening Date & Time | 14/05/2020 14:00 | 18/05/2020 14:00 |
| Last date & time for Tender/Proposal Security Submission | 14/05/2020 13:59 | 18/05/2020 13:59 |
| Closing Date & Time | 14/05/2020 14:00 | 18/05/2020 14:00 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 9.01 crore (Tk. Nine Crore & One Lakh) only over the last 5 (five) years. Years counting backward from the date of publication of IFT in the newspaper.
|
The required average annual construction turnover shall be greater than Tk 9.01 crore (Tk. Nine Crore & One Lakh) only over the last 5 (five) years. Years counting backward from the date of publication of IFT in the newspaper. The minimum amount of liquid assets submitted in the form of credit line of the Tenderer shall be Tk. 3.00 crore (Tk. Three Crore ) Only.
|
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None
|
The Nominated Subcontractor(s) named [insert name(s)] shall execute the following specific components of the proposed Works: None
|
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | date revised |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 26/04/2020 16:00 | 13/05/2020 16:00 |
| Opening Date & Time | 27/04/2020 14:00 | 14/05/2020 14:00 |
| Last date & time for Tender/Proposal Security Submission | 27/04/2020 13:59 | 14/05/2020 13:59 |
| Closing Date & Time | 27/04/2020 14:00 | 14/05/2020 14:00 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | closing date revised |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 15/04/2020 16:00 | 26/04/2020 16:00 |
| Eligibility of Consultant | 1. Tenderer must has to be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer only from Bangladesh can participate to the tender. 3. Tenderer must need to submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 4. Payment will be made after availability of fund. 5. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender data sheet, PPR-2008 and all up to date amendments. 6. Tenderer must need to submit line of credit certificate as prescribed format which is attached in the Section-7 (General Specifications) of this tender document. 7. Tender evaluation will be conducted by the basis of uploaded documents of tenderer. Outside or offline documents will not be considered. 8. Task Force of BWDB will count the number of Geo-Bag and CC Block. Final Payment will be made according to Task Force's final report. 9. Any type of persuasion will be treated as disqualification. |
1. Tenderer must has to be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer only from Bangladesh can participate to the tender. 3. Tenderer must need to submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 4. Payment will be made after availability of fund. 5. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender data sheet, PPR-2008 and all up to date amendments. 6. Tenderer must need to submit line of credit certificate as prescribed format which is attached in the Section-7 (General Specifications) of this tender document. 7. Tender evaluation will be conducted by the basis of uploaded documents of tenderer. Outside or offline documents will not be considered. 8. Task Force of BWDB will count the number of Geo-Bag and CC Block. Final Payment will be made according to Task Force's final report. 9. Any type of persuasion will be treated as disqualification. |
| Opening Date & Time | 16/04/2020 14:00 | 27/04/2020 14:00 |
| Last date & time for Tender/Proposal Security Submission | 16/04/2020 13:59 | 27/04/2020 13:59 |
| Closing Date & Time | 16/04/2020 14:00 | 27/04/2020 14:00 |
| Brief Description of Goods,Works or Service | Bank Protection work of Length 0.500 km along the Left bank of Bangali river at Kallani in Sherpur Upazila of Bogura District in c/w Dredging/Re-excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project under Bogura O&M Division BWDB Bogura during the FY 2019-2020 to 2021-2022. |
Bank Protection work of Length 0.500 km along the Left bank of Bangali river at Kallani in Sherpur Upazila of Bogura District in c/w Dredging/Re-excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project under Bogura O&M Division BWDB Bogura during the FY 2019-2020 to 2021-2022. |