| Field Name |
Old Value |
New Value |
| Document last selling date & time
|
16/02/2016 17:00 |
22/02/2016 17:00 |
| Eligibility of Consultant
|
Any tenderer(s) who fullfill the requirements Stated in TDS. The Tenderer with a poor performance, consistent history of litigation or arbitration awards against it shall not be eligible to tender.
If the quoted rate by the tenderer is found more than 5(Five) percent less/above than the Estimated price during evaluation, then it is mandatory to submit Rate Analysis.
* 60/70 Grade Bitumen shall be used in all Bituminous works in this project.
* For preparation of DBS materials Asphalt Plant must be used by the contractor.
* The tenderer shall have their own Asphalt Plant. If the tenderers do not have their own Asphalt Plant they may hire it from any other source; But then the tenderers have to submit the contractual agreement to hire or lease of the Asphalt Plant in non-judicial stamp of Tk. 300 affidavit by the notary public.
* The Additional Chief Engineer, RHD, Chittagong Zone will visit the plant before evaluation process to verify the location and condition of the plant.
* The Defects Liability Period is 730 Days.
|
Any tenderer(s) who fullfill the requirements Stated in TDS. The Tenderer with a poor performance, consistent history of litigation or arbitration awards against it shall not be eligible to tender.
If the quoted rate by the tenderer is found more than 5(Five) percent less/above than the Estimated price during evaluation, then it is mandatory to submit Rate Analysis.
* 60/70 Grade Bitumen shall be used in all Bituminous works in this project.
* For preparation of DBS materials Asphalt Plant must be used by the contractor.
* The tenderer shall have their own Asphalt Plant. If the tenderers do not have their own Asphalt Plant they may hire it from any other source; But then the tenderers have to submit the contractual agreement to hire or lease of the Asphalt Plant in non-judicial stamp of Tk. 300 affidavit by the notary public.
* The Additional Chief Engineer, RHD, Chittagong Zone will visit the plant before evaluation process to verify the location and condition of the plant.
* The Defects Liability Period is 730 Days.
*Performance of the Contractor will be evaluated throughout the contract period and Defect Liability Period at a scale of 100 and Performance Evaluation Certificate will
be issued(format uploaded).
|
| Opening Date & Time
|
17/02/2016 12:15 |
23/02/2016 12:15 |
| Last date & time for Tender/Proposal Security Submission
|
16/02/2016 17:00 |
22/02/2016 17:00 |
| Closing Date & Time
|
17/02/2016 12:00 |
23/02/2016 12:00 |
| TDS/PDS--C. Qualification Criteria--
|
|
TDS Clauses References |
Requirements by summation |
Requirements for Lead Partner of JVCA |
Requirements for other Partner(s) of JVCA |
|
ITT-15.1(a) |
Summation not applicable |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of Roads of at least one contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years (years counting backward from the date of publication of IFT), each with a value of at least Tk. 6.00 Crore with minimum quantity of overlay/DBS work (Plant Method) in a single contract should be 3000.00 cum. |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of Roads of at least one contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years (years counting backward from the date of publication of IFT), each with a value of at least Tk. 1.50 Crore with minimum quantity of overlay/DBS work (Plant Method) in a single contract should be 750.00 cum.
|
|
ITT-15.1(b) |
100% |
At least one Contract |
Minimum requirement not applicable |
|
ITT-16.1(a) |
100% |
40% |
25% |
|
ITT-16.1(b) |
100% |
40% |
25% |
|
ITT-17.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-18.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300
|
|
TDS Clauses References |
Requirements by summation |
Requirements for Lead Partner of JVCA |
Requirements for other Partner(s) of JVCA |
|
ITT-15.1(a) |
Summation not applicable |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of Roads of at least one contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years (years counting backward from the date of publication of IFT), each with a value of at least Tk. 6.00 Crore with minimum quantity of overlay/DBS work (Plant Method) in a single contract should be 3000.00 cum. |
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of Roads of at least one contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years (years counting backward from the date of publication of IFT), each with a value of at least Tk. 1.50 Crore .
|
|
ITT-15.1(b) |
100% |
At least one Contract |
Minimum requirement not applicable |
|
ITT-16.1(a) |
100% |
40% |
25% |
|
ITT-16.1(b) |
100% |
40% |
25% |
|
ITT-17.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
|
ITT-18.1 |
100% |
Minimum requirement not applicable |
Minimum requirement not applicable |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300
|
| Brief Description of Goods,Works or Service
|
Rehabilitation works under Periodic Maintenance Program Providing DBSW at different K.M of Hathazari-Fatikchari-Manikchari-Matiranga-Khagrachari Road (R-160) under Chittagong Road Division during the year 2015-2016; Chainage: Ch. 3+500m to 7+200m = 3700.00m, Ch. 8+200m to 9+000m = 800.00m, Ch. 9+600m to 11+000m = 1400.00m, Ch. 11+750m to 14+110m = 2360.00m, Ch. 15+000m to 24+500m = 9500.00m & Nazirhat Bazar Link Road = 900.00m, Grand Total Length = 18660.00 Meter.
|
Rehabilitation works under Periodic Maintenance Program Providing DBSW at different K.M of Hathazari-Fatikchari-Manikchari-Matiranga-Khagrachari Road (R-160) under Chittagong Road Division during the year 2015-2016; Chainage: Ch. 3+500m to 7+200m = 3700.00m, Ch. 8+200m to 9+000m = 800.00m, Ch. 9+600m to 11+000m = 1400.00m, Ch. 11+750m to 14+110m = 2360.00m, Ch. 15+000m to 24+500m = 9500.00m & Nazirhat Bazar Link Road = 900.00m, Grand Total Length = 18660.00 Meter.
|