01. A satisfactory completion of similar nature of works at least Tk.27,00,000.00 (Taka twenty seven Lakh) only under a single contract over the last three (03) years shall be required. 02. The required average annual construction turnover shall be greater than at least Tk.54,00,000.00 (Taka fifty four lakh ) only over the last three (03) years.
03. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk.27,00,000.00 (Taka twenty seven Lakh)only which shall be supported by bank statement and the statement will not before tender publication date in the e-GP portal. Tenderer those who will submit credit facilities from the bank, they should submit Letter of Commitment for Bank’s Undertaking for line of Credit (Form ePW2a-3). 04. The Tenderers whose trade license is valid for DPDC area, only they are eligible to submit the tender. 05. The Tenderer must have a valid Electrical Contractors License with ABC & Electrical Supervisory License. 06. Years counting backward from the date of publication of IFT in the e-GP. 07. The Tenderers up to date contact information must be same in all submitted documents. 08. The tenderer must have valid and up to date VAT, e-TIN, Bank Solvency certificate & three years Audit Report. 09. All other Terms & Conditions will be available in the Tender document. Note: 01. Tenderer who will be quoted rate less than 10% or above 10% of the official cost estimate must be rejected as per amended PPA gadget 2016.
Laying of33KV 1C 800mm2 XLPE Cu Underground cable from Mogbazar 132/33 KV Grid Substation to Green Road Dormitory 33/11 KV GIS Substation