a. A satisfactory completion of similar works of at least Tk 1,50,000.00 under 01(one) of contract over a period of last 03 (Three) years shall be required.
b. The required average annual construction turnover shall be greater than Tk 1,50,000.00 over the last 03 (Three) years.
c. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 150,000.00.
d. Valid Up-To-Date Trade License, TIN Certificate, VAT Certificate and Electricity Contractor and ABC License from Electricity Licensing Board shall be required.
Repair of Cooling Fan installed at Power Transformers Located in different Substations of Grid South-2 DPDC.