A satisfactory completion of similar works at least Tk 3.00 (Three ) lakhs under Single of contract over a period of last 03(Three) years shall be required. Counting backward from the date of publication of IFT in the website. The required average annual construction turnover shall be greater than Tk 6.00 (Six) lakhs over the last 03 (Three) years. Counting backward from the date of publication of IFT in the website. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 3.00 (three) lakhs.
Repair works with seal coat work at 33th km(p) (ch.33+00 to 33+470m) of Fatullah- Munsigonj-Louhajong-MawaRoad (R-812) under road division Munsigonj during the year 2013-2014.