| Amendment / Corrigendum Text : | Due to Correction TDS, Qualification Criteria ITT Clause 16.1(b) & Bill Of Quantities 14(h) |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 09/06/2020 17:00 | 14/06/2020 17:00 |
| Eligibility of Consultant | 1. As per TDS. 2. Moreover, The recent amendment of PPA, 2006 which is made vide Act no.37 of 2016 and published vide Bangladesh Gazettee registered no. D A-1 on 01.08.2016 ( 17 Srabon 1423) , of which according to the cluase no. 07 & sub-cluase no.03 "For Open Tender Method (OTM) for procurement of works Tenderer will be considered as non-responsive if the quated rate is 10% more or less than the official cost estimates". On the other hand according to subcluase no.04 of cluase no.07, "If the quated rate of all Tenderers are found equal, then reponsive Tendrer will be selected as per rule, but not through |
1. As per TDS. 2. Moreover, The recent amendment of PPA, 2006 which is made vide Act no.37 of 2016 and published vide Bangladesh Gazettee registered no. D A-1 on 01.08.2016 ( 17 Srabon 1423) , of which according to the cluase no. 07 & sub-cluase no.03 "For Open Tender Method (OTM) for procurement of works Tenderer will be considered as non-responsive if the quated rate is 10% more or less than the official cost estimates". On the other hand according to subcluase no.04 of cluase no.07, "If the quated rate of all Tenderers are found equal, then reponsive Tendrer will be selected as per rule, but not through |
| Opening Date & Time | 10/06/2020 14:00 | 15/06/2020 14:00 |
| Last date & time for Tender/Proposal Security Submission | 10/06/2020 13:59 | 15/06/2020 13:59 |
| Closing Date & Time | 10/06/2020 14:00 | 15/06/2020 14:00 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 130 lac over the last 05 years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 130 lac over the last 05 years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 64.00 Lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
| Brief Description of Goods,Works or Service | Pond Re-excavation 05 Nos Morrelganj Upazila Bagerhat District Scheme During the year 2019-2020 under Water preservation and Safe Water Supply Project Through Re-excavation/Maintenance of Ponds/Dighi/Ditches Owned by Zilla ParishadsDPHE. |
Pond Re-excavation 05 Nos Morrelganj Upazila Bagerhat District Scheme During the year 2019-2020 under Water preservation and Safe Water Supply Project Through Re-excavation/Maintenance of Ponds/Dighi/Ditches Owned by Zilla ParishadsDPHE. |