A satisfactory completion of similar works at least Tk 3.00 (Three ) lakhs under Single of contract over a period of last 03(Three) years shall be required. Counting backward from the date of publication of IFT in the website. The required average annual construction turnover shall be greater than Tk 6.00 (Six) lakhs over the last 03 (Three) years. Counting backward from the date of publication of IFT in the website. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 3.00 (three) lakhs.
Repair work with seal coat work at 31st(P) KM (ch. 30+692 to 31+140m) of Fatullah- Munshigonj-Lauhajonj- Mawa Road under Munshigonj Road Division during 2013-2014.