Eligibility and conditions of the tenderer are shown in TDS of tender documents.
On CN branch Construction of ballast wall at Km. 18/6-7( both side) 200'-0", at km. 18/9-19/0(both side)=100'-0", at km. 19/2-4(both side)=300'-0", at km. 19/4-5(both side)=300'-0" & at km. 19/6-7 (both side)=300'-0" Total= 1200 rft including repairs to cess & bank with other allied works