As Per TDS.
Bituminus Carpeting,Base with WBM,Subbase with ASS, Improve subgrade with Sand,box cutting, Slope protection work with palasiding,earth work and a U-drain etc. (The Amount of Salvage Materials Tk. 12,544.00 will be Deducted from Bill)