Manufacturer or the Authirized Distributor/Supplier of the required item Or in the case of Contractor, the tenderer must submit Consent Letter from the Manufacturer/Authorized distributer in their submitterd tender.
Supply and installation air cooler at Sonargaon Grid Substation under GMD Dhaka East PGCB