All tenderer of Bangladesh who fulfill the qualification criteria as stated in the Tender Data Sheet (TDS) and Tender Document Special Instruction: • The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. • The Tenderers with own responsibility and expense will visit and examine the Site and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works. • For line of Credit from any scheduled Bank of Bangladesh all the bidders must submit an unconditional assurance certificate following the standard format (Form PW3-7) without alteration. Otherwise Tender will not be considered. Form PW3-7 has been attached in Section 7(General Specification). • For free funds/liquid assets as Cash the tenderer should submit last three month bank statement and during whole period (last three month) there must have minimum/average balance amount as stated in TDS. Otherwise the submitted bank statement or other certificate will not be treated as liquid asset
It is noted that the VAT/IT/Payment certificate is not accepted for calculating Turnover. Only work completed ceretificate from concern PE is considered for calculating the turnover.
Special Note: PE reserve the all power to cancell the tender (If Required) any time. For these no claim will entitle from the participated tenderer. NOA should be issue after getting necessary approval / permission from DG/ BWDB or MOWR .
Bank protective work adjacent to Bibiyana power plant along the right bank of Kushiyara River from Km 3.000 to km 3.300 total 300m in c/w Bank Protective Work along the both bank of kushiyara river in front of Bibiyana Power Plants in Habiganj District Project in Upazila Nabiganj Dist. Habiganj Under Habiganj O & M Division BWDBHabiganj during the year 2019 -2020 to 2021-2022