View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Time extension |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 03/09/2020 15:00 | 10/09/2020 15:00 |
| Opening Date & Time | 06/09/2020 14:10 | 13/09/2020 14:10 |
| Meeting End Date & Time | 30/08/2020 14:42 | 03/09/2020 14:42 |
| Last date & time for Tender/Proposal Security Submission | 06/09/2020 14:00 | 13/09/2020 14:00 |
| Closing Date & Time | 06/09/2020 14:10 | 13/09/2020 14:10 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | similar experience |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. Evaluation will be performed as per latest amendment of PPA-2006 and PPR-2008. 2. Other condition will remain same as per TDS 3. It is to be noted that quoted boring rate should be increased proportionately according to the depth of the well otherwise tender would be consider non- responsive without acceptable clarification. |
1. Evaluation will be performed as per latest amendment of PPA-2006 and PPR-2008. 2. Other condition will remain same as per TDS 3. It is to be noted that quoted boring rate should be increased proportionately according to the depth of the well otherwise tender would be consider non- responsive without acceptable clarification. |
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works ( Experience for Installation of Tubewell with submersible pump and PTW only. Experience of Pipe line, OHT, Drain, TP or other construction work will not be considered) of at least Tk 90 lacs ( ninety lac) under single number of contract(s) over a period of 03 years shall be required counting backward from the date of publication of IFT in the newspaper or e-GP web portal.
|
A satisfactory completion of similar works ( Experience for Installation of Tubewell with submersible pump only. Experience of Pipe line, OHT, Drain, TP, PTW or other construction work will not be considered) of at least Tk 90 lacs ( ninety lac) under single number of contract(s) over a period of 03 years shall be required counting backward from the date of publication of IFT in the newspaper or e-GP web portal. |
| Brief Description of Goods,Works or Service | Installation of 78 nos. Deep Tube well 100x38mm with Submersible Pump at Murapara, Bhulta, Rupganj Union in Rupganj Upazila under the Project for Safe Water Supply throughout the Country. |
Installation of 78 nos. Deep Tube well 100x38mm with Submersible Pump at Murapara, Bhulta, Rupganj Union in Rupganj Upazila under the Project for Safe Water Supply throughout the Country. |