1. As per ITT, TDS, GCC, PCC, PPR2008 , PPA206 and all of its Latest Amendment 2. Boring Rate should be increase as depth of Tube Well increase . 3. Contractor only claim the bill for Specific Tube Well after getting acceptable material test report proper development , adequate discharge, getting clear water, water test report, complete of all component including name plate with ID no and taking Hand Over Certificate form the caretaker 4. lot by lot tender
VWSP-1815/1 ID No-484548 Installation of 28 nos 100 x 50mm dia shrouded Tube Well with 1.0 HP capacity submersible pump in Kalmakanda 10 Durgapur 8 & Khalijuri 10 & 6 nos Ring well/Dug well No 6 Hand Pump in Durgapur 3 and kalmakanda 3 under Village Water Supply Project of Department of Public Health Engneering DPHE during the FY 2020-21