View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Local Government Engineering Department (LGED) Procuring Entity Name : Office of the Upazila Engineer, LGED, Banaripara, Barisal
Procuring Entity Code : Procuring Entity District : Barishal
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : APP ID : 159706 Tender/Proposal Status :
App ID : 159706 Tender/Proposal ID : 485217
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government, Aid or Grant
Particular Information :
Project Code : 2242237900 Project Name : Fourth Primary Education Development Program
Tender/Proposal Package No. and Description : e-Tender/PEDP4/BAR/BAN/2019-20/W1.00869
Construction of Additional class room POSCHIM ILLUHAR GPS under PEDP-4 under Banaripara upazila Barisal.
Category : Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
Scheduled Tender/Proposal Publication
Date and Time :
20-Aug-2020 23:43 Tender/Proposal Document last selling /
downloading Date and Time :
13-Sep-2020 11:00
Pre - Tender/Proposal meeting Start
Date and Time :
20-Aug-2020 23:58 Pre - Tender/Proposal meeting End
Date and Time :
03-Sep-2020 17:00
Tender/Proposal Closing
Date and Time :
13-Sep-2020 12:00 Tender/Proposal Opening
Date and Time :
13-Sep-2020 12:00
Last Date and Time for Tender/Proposal Security
Submission :
13-Sep-2020 11:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As per TDS

Brief Description of Works :

Construction of Additional class room POSCHIM ILLUHAR GPS under PEDP-4 under Banaripara upazila Barisal.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 2000
Mode of Payment :
Tender/Proposal Security Valid Up to : 08-Feb-2021
Tender/Proposal Valid Up to : 11-Jan-2021
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Construction of Additional class room POSCHIM ILLUHAR GPS under PEDP-4 under Banaripara upazila, Barisal. Banaripara 325000 01-Nov-2020 01-Aug-2021
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Humayon Kabir Designation of Official Inviting Tender/Proposal : Upazila Engineer
Address of Official Inviting Tender/Proposal :
Address: Banaripara Upazila Parishad, Kunbihar 5No ward, Banaripara
City: Banaripara
Thana: Banaripara
District: Barishal - 8530
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 04332-56115
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text :

Need to extend time

Field Name Old Value New Value
Completion Date(Lot No : 1) 01/07/2021 01/08/2021
Document last selling date & time 06/09/2020 11:00 13/09/2020 11:00
Opening Date & Time 06/09/2020 12:00 13/09/2020 12:00
Meeting End Date & Time 27/08/2020 17:00 03/09/2020 17:00
Last date & time for Tender/Proposal Security Submission 06/09/2020 11:00 13/09/2020 11:00
Start Date(Lot No : 1) 01/10/2020 01/11/2020
Closing Date & Time 06/09/2020 12:00 13/09/2020 12:00
Amendment / Corrigendum/ Addendum No. : 2
S. No. File Name File Description File Size
(in KB)
1 Scan-1.pdf Docs 1332012
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Need correction

Field Name Old Value New Value
Eligibility of Consultant

As per TDS

As per TDS

PCC--B. Time Control--

Commencement Date of Works shall be as follows;

[insert different commencement dates for different parts of the Works, if deemed appropriate]
 

Commencement Date of Works shall be as follows;

After 07 days of site possession date.

PCC--B. Time Control--

The period between Programme updates is [state interval]

[usually bi-monthly or quarterly depending on the nature of the Works]
 

The period between Programme updates is quarterly
 

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract.

[usually fifteen (15) days]
 

The Contractor shall submit a Programme for the Works within  fifteen (15) days of signing the Contract.


 

PCC--B. Time Control--

The amount to be withheld for late submission of an updated Programme is [state amount].

The amount to be withheld for late submission of an updated Programme is

Tk.10000.00

PCC--C. Quality Control--

The Defects Liability Period is [state months]

[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is  twelve (12) months.

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:


[list events or state none ]
 

The following additional events shall also be the Compensation Events:

 none
 

PCC--D. Cost Control--

The Contract is not subject to price adjustment.
OR
The Contract is subject to price adjustment, the weightings or coefficients for adjustment are:

[Price Adjustment Formulae to be applicable if stated under ITT Sub Clause 27.10 shall be specified here]
Example:
P= A + a (Lm/Lo)+ b (BIm/BIo)+ c (CEm/CEo)+ d (RSm/RSo)+ e (STm/STo)+ f (BRm/BRo)+g (MIm/MIo) + h (FUm/FUo)+ etc
where;
L= Labor, BI=Bitumen, CE=Cement, RS=Reinforcing Steel, ST=Stone, BR=Bricks, MI=Miscellaneous, FU= Fuel ]
Weighting or Coefficient A equals between 0.10 and 0.15 and, B (a+b+c+d+e+f+g+h+etc) equals between 0.90 and 0.85.

[insert figure] non-adjustable component (coefficient A)
[insert figure] adjustable component (coefficient B)
[The sum of A+B shall equal ONE (1). It is usual to have value of A between 0.10 and 0.15 and that of B between 0.90 and 0.85. Breakdown of B shall be provided in Appendix to the Tender.]
[delete as appropriate]

[price adjustment clauses are usually only permitted for Works Contracts, execution of which will take more than eighteen (18) months from Start Date to Completion Date. The PE must consider each Contract on its individual merit; approval of HOPE required for Contracts of less than eighteen (18) months]
 

The Contract is not subject to price adjustment.

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.


[state “none’ if not applicable. If applicable then the proportion of Retention Money shall be equal to the percentage-shortfall of ten (10) percent of Performance Security determined at the time of signing the Contract. Again in case of unbalanced Tender or because of front loading, provision for Retention Money shall not be applicable]
 

The proportion of payments to be retained is atleast five(5) percent from each bill.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of its Contract price per day of delay]
Guide to application of GCC Sub Clause 76.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x Px n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay
n = No of days of delay for completion of works under the Contract]

 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.


[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]

 

The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.01%(point zero one percent) of its Contract price per day
of delay.
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is ten (10) percent of the final Contract price of the whole of the Work

PCC--D. Cost Control--

The Bonus for the whole of the Works is [insert percentage] percent of the final Contract price per day.

The maximum amount of Bonus for the whole of the Works is [insert percentage] percent of the final Contract price.

[if early completion would provide benefits to the PE, this clause should remain, otherwise state “Not Applicable”. The bonus is usually numerically equal to the Liquidated Damages]
 

The Bonus for the whole of the Works is“Not Applicable”.

PCC--D. Cost Control--

The Advance Payment shall be Tk [insert amount] and shall be paid to the Contractor not later than [insert date].

[for 100 percent GoB funded procurement, advance payments are not recommended unless otherwise specifically decided by the Government. An advance payment, if admissible, shall be made for mobilisation, considering the nature of the works. The recommended maximum advance payment is ten (10) percent of the original Contract price against an unconditional Bank Guarantee (Form e-PW3-10.) On the contrary, advance payments may be applicable for procurements under aided projects]
 

The Advance Payment shall be

“Not Applicable”.

PCC--D. Cost Control--

The percentage for adjustment of Provisional Sums is

____% (_________percent)
[state none, if not applicable. Usually covers the VAT, profit and overhead costs]
 

The percentage for adjustment of Provisional Sums is

 none

PCC--E. Completion of the Contract--

The date by which “as-built” drawings are required is [insert date]

 

The date by which operating and maintenance manuals are required is [insert date]

The date by which “as-built” drawings are required is

One week before final bill

PCC--E. Completion of the Contract--

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]

[usually a very nominal amount]
 

The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk.10000.00

PCC--F. Termination and Settlement of Disputes--

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is ten (10) percent.

PCC--G. Claims, Disputes and Arbitration--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]

The arbitration shall be conducted in the place mentioned below;
LGED, HQ

Agargaon, Dhaka

PCC--G. Claims, Disputes and Arbitration--

The Adjudicator jointly appointed by the parties is:
Name:
Address:
Tel No:
Fax No:
e-mail address:

 

In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. 

The Adjudicator jointly appointed by the parties is:
Name:Md.Sharifuzzaman (Retd.Addl. Chief Engineer)
Address:1/6(B), Block-B,Lucky Appartment, Flat No.5/C, Lalmatia, Dhaka-1207
Tel No:
Fax No:
e-mail address:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh.

Brief Description of Goods,Works or Service

Construction of Additional class room POSCHIM ILLUHAR GPS under PEDP-4 under Banaripara upazila Barisal.

Construction of Additional class room POSCHIM ILLUHAR GPS under PEDP-4 under Banaripara upazila Barisal.

 