A satisfactory completion of buried pipe line construction works of at least Taka 900,000/- (Nine Lakh). under Single number of contract over a period of last 3 (Three) years counting backward from the date of publishing the tender shall be required. The required average annual construction turnover shall beTK.12,00,000/- (Twelve Lakh). over the last three (3) years counting backward from the date of publication of IFT in the newspaper
The Minimum amount of liquid asset is TK.1200,000/- (Twelve Lakh). Regarding this purpose only Bank statement (from the date of publishing the tender in web site to the date of submission of tender by the tenderer) will be consider.
The minimum capacity shall be: Tk. 9,00,000/- (Nine Lakh).
Extension of Buried Pipe line Each 600 meter length for 3 nos of 2 Cusec old DTW at Saturia Upazila Manikganj