a) A satisfactory completion of similar works or RCC Construction works of at least Tk 13.00 (Thirteen) Crore under one (01) no. of contract over a period of five (05) years shall be required.
b) The required average annual construction turnover shall be greater than Tk 17.00 (Seventeen) Crore over the best three (03) years in the last five (5) years.
c) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 3.00 (Three) Crore.
d) The minimum Tender capacity shall be: Tk. 19.00 (Nineteen) Crore.
Construction of Four 04 nos. additional Gangway for 400 Meter Lighterage Jetty at Shadarghat.