View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum for tender document |
| Field Name | Old Value | New Value |
|---|---|---|
| Completion Date(Lot No : 0) | 30/09/2021 | 31/10/2021 |
| Eligibility of Consultant | As state in tender document. |
As state in tender document. |
| PCC--A. General-- | The Sectional Completion Dates are: Not Applicable. |
The Sectional Completion Date for the whole of the Works shall be 09 (Nine) months from the Signing of the Contract. |
| TDS/PDS--C. Qualification Criteria-- | The minimum capacity shall be Tk. 24500000.00(Two Core Forty Five Lakh). |
The minimum capacity shall be Tk. 12500000.00(One crore twenty five lakh). |
| TDS/PDS--C. Qualification Criteria-- | a) The required average annual construction turnover shall be greater than Tk. 7,00,00,000 (Seven Core ) over the last 05 (Five) years.
b) The Liquid asset ( working capital or credit line(s) from any Scheduled Bank) will be minimum TK. 1,10,00,000 (One Core Ten Lakh).
c) Satisfactory resolution of all claims, arbitrations or other litigation cases and shall not have serious negative impact on the financial capacity of Tenderer.
|
a) The required average annual construction turnover shall be greater than Tk. 4,50,00,000 (Four core fifty lakh) over the last 05 (Five) years.
b) The Liquid asset ( working capital or credit line(s) from any Scheduled Bank) will be minimum TK. 1,10,00,000 (One Core Ten Lakh).
c) Satisfactory resolution of all claims, arbitrations or other litigation cases and shall not have serious negative impact on the financial capacity of Tenderer.
|
| TDS/PDS--C. Qualification Criteria-- | The Nominated Subcontractor(s) named [Nill] shall execute the following specific components of the proposed Works: None |
The Nominated Subcontractor(s) named [Nill] shall execute the following specific components of the proposed Works: None |
| Brief Description of Goods,Works or Service | At CN Branch: Reconstruction of Bridge No. CN/17 (1x9.14m) span in place of 1x8'-0" span Arch bridge in bewteen SLHR-CTGC at km. 8/6-7 with temporary arrangement and other allied works as per approved Drawing. |
At CN Branch: Reconstruction of Bridge No. CN/17 (1x9.14m) span in place of 1x8'-0" span Arch bridge in bewteen SLHR-CTGC at km. 8/6-7 with temporary arrangement and other allied works as per approved Drawing. |