The required annual construction turnover shall be greater than Tk. 65.00. lakh over the last 05 (five) years.
A satisfactory completion of similar works of at least Tk.9.00 lakh under Single of contract over a period of last 05(five) years shall be required years.
Counting backward from the date of publication of IFT in the website. The minimum amount of liquid assets, net of other contractual commitments, is Tk.9.50 lakh. Experienced of previous work
supplying of different size of Stone Chips, brick chips, Pea-gravels & Firewood for emergency maintenance work of different road of Narayangonj Road Sub-Division-1 of Narayangonj Road Division Stac-yeard compound in measurable stacks, loading, unloading, carrying up to work site etc. all complete in all respect as per direction of the E/ch.