As per PPR-2008, BWDB Instructions and as per tender document and has to be registered in e-GP portal.
Re-excavation of Machbazar Khal from Km 0.000 to Km 4.000 = 4.000 Km in between Polder No. 41/1 & 41/2 under Re-excavation of small river khal & water bodies in 64 Districts Phase-1 (1st Revised) at Barguna O&M Division BWDB Barguna during the year 2020-21 (Package No.: Barguna/W-03/2020-21)