Special Instructions: 1. Only e-GP registered Tenderer/Firms can participate to the Tender. 2. Tenderer should fulfill all criterias which are stated in TDS. 3. Tenderer should submit their credit line facility/Liquid assets certificate according to attached format (From PW3-3, in section-7). Without credit line facility/Liquid assets certificate according to attached format tender declare a nonresponsive. 4. Payment will be made upon availability of fund and after Pre & Post work Measurement by BWDB's office & monitoring team . For this no claim will entertain.
5. Quoted amount of tender beyond 10% above/less than official estimated cost will be non-responsive. 6. After completion the tender opening process. If disable to download the important documents of the tender. Which consider to tender evaluation. In order to the tender may be treated as non-responsive. 7. The Tenderers will visit and examine the site with his own responsibility & expenses and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works. 8. Latest GoB circular on procurement of works will be applicable. 9. Evaluation will be done on the basis of the past performance Evaluation matrix. So, authenticated information along with documents will have to be incorporated with the tender. Planned & Actual start/commencement & completion date will have to clearly mentioned in the work certificate. 10. Arrangement of land for working area or site office (if any) need to be made by the tenderer and no claim in this regard will be entertained. Also the work will be completed by tenderer of his own management of site. 11. The authority reserves the right to accept or reject any/all tender(s) without showing any reason.
Re-excavation of connecting Khal LC-5 From Mondolpara Bridge to Banglabazar Bridge via Ramchandrapur Sluice From Km. 0.00 to Km 2.670 and Ichamoti River From Mondolpara Bridge to Shalgaria Shashan Ghat LC-5 Form Km. 0.00 to Km. 5.00 Total 7.670 Km. in C/W Re-excavation of small Rivers Khal and Waterbodies in 64 Districts 1st Phase1st Revised Project under Pabna O&M Division BWDB Pabna during the FY- 2020-21.
Which work will be executed: 01. Earth work in all kinds of soil in excavation/ re-excavation of Ichamoti River by Mechanical excavator(Long Boom).;
02. Fine dressing of excavated earth with close turfing of grass on the both bank of Ichamoti river.
N.B. Similar works should be the following types of work: a). Earth work in all kinds of soil in excavation/ re-excavation of River/channel /canal/khal etc by Mechanical excavator(Long Boom); or
b). Earth work in constructing/re-sectioning of embankment/canal bank/canal dyke/ earthen road by Mechanical excavator with or without manual labour etc.;