As a stated in the tender documents.
At SSAE/Way/KFJ section: Complete track renewal of loop line No.3 (2000 rft) at KKPD station, Loop line No.1 (2300rft) at KJB station, Loop line No.1 (2210rft) at SCD station Loop line No.2 (2200 rft) at MNN station total 8710rft = 2.66 km of wooden sleepered MG track having 75R rail with 75 A rail (S/H) and PSC sleeper (S/H) with other related works.