View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Water Resources Division :
Organization : Bangladesh Water Development Board (BWDB) Procuring Entity Name : Satkhira O&M Division-1
Procuring Entity Code : Procuring Entity District : Satkhira
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 1T-4/1981, dated 25-01-2021 Tender/Proposal Status :
App ID : 170352 Tender/Proposal ID : 534269
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 224318700 Project Name : Drainage Improvement of Polder 1, 2, 6-8 & 6-8 (Extention) in Satkhira District.
Tender/Proposal Package No. and Description : W sat-1/4
Re-Excavation of Morrichap River From Km 12.000 to Km 20.00 total 8.000Km polder no-1 in C/W Drainage Improvement of Polder 1 2 6-8 and 6-8 Extension Project in Satkhira District under Satkhira O&M Division-1 BWDB Satkhira during the Year-2020-21
Category : Engineering works and construction works; Works for complete or part construction and civil engineering work;
Scheduled Tender/Proposal Publication
Date and Time :
26-Jan-2021 20:25 Tender/Proposal Document last selling /
downloading Date and Time :
07-Mar-2021 16:00
Pre - Tender/Proposal meeting Start
Date and Time :
27-Jan-2021 10:00 Pre - Tender/Proposal meeting End
Date and Time :
21-Feb-2021 16:00
Tender/Proposal Closing
Date and Time :
08-Mar-2021 11:00 Tender/Proposal Opening
Date and Time :
08-Mar-2021 11:00
Last Date and Time for Tender/Proposal Security
Submission :
07-Mar-2021 17:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

1. Payment may require two or more years. No claim of interest for delaying of payment will be entertained.
2. Spoil earth management will followed as per instruction of Engineer in Charge
3. Quantity of tender item may increase or decrease
4. Prework or Postwork will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the measurement taken by taskforce.
5. The selected contractor will hand over total site at a time. No scope to handover site partly.
6. Silt will be removed by contractor untill the final measurement is taken. Otherwise final post work will be taken above the silt.
7.The contractor will bear the expense to remove of illegal occupancy/structurse if remain besides the river
8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor.
9. The design may be changed/ altered.
10. All the liability of contractor personnel will be borne by contractor.

11. Earthen Dyke Will be constructed by excavated earth along the River/Canal sides considering the existing surrounding & land propietorship.as per direction of engineer in Charge. No financial claim for construction of earthen Dyke will be allowed.

Brief Description of Works :

Re-Excavation of Morrichap River From Km 12.000 to Km 20.00 total 8.000Km polder no-1 in C/W Drainage Improvement of Polder 1 2 6-8 and 6-8 Extension Project in Satkhira District under Satkhira O&M Division-1 BWDB Satkhira during the Year-2020-21

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 02-Sep-2021
Tender/Proposal Valid Up to : 05-Aug-2021
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
W sat-1/4 Re-Excavation of Morrichap River From Km 12.000 to Km 20.00 total 8.000Km polder no-1 in C/W "Drainage Improvement of Polder 1, 2 6-8 and 6-8 (Extension)" Project in Satkhira District under Satkhira O&M Division-1, BWDB, Satkhira during the Year-2020-21 Satkhira 5900000 21-Apr-2021 22-May-2022
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Abul Khaer. Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Satkhira
City: Satkhira
Thana: Satkhira Sadar
District: Satkhira - 9400
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0471-62446
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

corrigendum for Similar Work Experience

Field Name Old Value New Value
Document last selling date & time 28/02/2021 16:00 07/03/2021 16:00
Eligibility of Consultant

1. Payment may require two or more years. No claim of interest for delaying of payment will be entertained.
2. Spoil earth management will followed as per instruction of Engineer in Charge
3. Quantity of tender item may increase or decrease
4. Prework or Postwork will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the measurement taken by taskforce.
5. The selected contractor will hand over total site at a time. No scope to handover site partly.
6. Silt will be removed by contractor untill the final measurement is taken. Otherwise final post work will be taken above the silt.
7.The contractor will bear the expense to remove of illegal occupancy/structurse if remain besides the river
8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor.
9. The design may be changed/ altered.
10. All the liability of contractor personnel will be borne by contractor.

11. Earthen Dyke Will be constructed by excavated earth along the River/Canal sides considering the existing surrounding & land propietorship.as per direction of engineer in Charge. No financial claim for construction of earthen Dyke will be allowed.

1. Payment may require two or more years. No claim of interest for delaying of payment will be entertained.
2. Spoil earth management will followed as per instruction of Engineer in Charge
3. Quantity of tender item may increase or decrease
4. Prework or Postwork will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the measurement taken by taskforce.
5. The selected contractor will hand over total site at a time. No scope to handover site partly.
6. Silt will be removed by contractor untill the final measurement is taken. Otherwise final post work will be taken above the silt.
7.The contractor will bear the expense to remove of illegal occupancy/structurse if remain besides the river
8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor.
9. The design may be changed/ altered.
10. All the liability of contractor personnel will be borne by contractor.

11. Earthen Dyke Will be constructed by excavated earth along the River/Canal sides considering the existing surrounding & land propietorship.as per direction of engineer in Charge. No financial claim for construction of earthen Dyke will be allowed.

Opening Date & Time 01/03/2021 11:00 08/03/2021 11:00
Meeting End Date & Time 07/02/2021 16:00 21/02/2021 16:00
Last date & time for Tender/Proposal Security Submission 28/02/2021 17:00 07/03/2021 17:00
Closing Date & Time 01/03/2021 11:00 08/03/2021 11:00
TDS/PDS--C. Qualification Criteria--

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 (three) years. years counting backward from the date of publication of IFT in the newspaper.

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 2  (Two) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 years, each with a value of at least Tk. 1540 lakh.years counting backward from the date of publication of IFT in the newspaper. Similar work include Re Excavation work of  River/Khal/Canal.

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 (three) years. years counting backward from the date of publication of IFT in the newspaper.

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 2 (Two) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 years, 2 (Two) with a value of Total Tk. 1540 lakh.years counting backward from the date of publication of IFT in the newspaper. Similar work include Excavation/ Re-Excavation of River/Khal/Canal & Earthwork for Constructing/reconstructing / Re sectioning of Embankment.
 

Brief Description of Goods,Works or Service

Re-Excavation of Morrichap River From Km 12.000 to Km 20.00 total 8.000Km polder no-1 in C/W Drainage Improvement of Polder 1 2 6-8 and 6-8 Extension Project in Satkhira District under Satkhira O&M Division-1 BWDB Satkhira during the Year-2020-21

Re-Excavation of Morrichap River From Km 12.000 to Km 20.00 total 8.000Km polder no-1 in C/W Drainage Improvement of Polder 1 2 6-8 and 6-8 Extension Project in Satkhira District under Satkhira O&M Division-1 BWDB Satkhira during the Year-2020-21

 
Save As PDF