a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, Vat Registration and TIN certificate. b) Quoted amount of tenderer beyond 10% above/less than official estimated cost will be non- responsive. c) It is duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not able to open the file, no claim from the tenderer will be entertained regarding the file. d) Vat & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard. e) Tender evaluation will be done following the latest gazette /circular from CPTU. f) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted. g) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard. h) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. i) Photo and video must have to be taken by the contractor at a different angle during pre-work and post-work measurement and submitted to the PE. No extra claim will be entertained in this regard. j) Quantity and quality of work must be checked by BWDB's Task Force. k) All other criteria stated in the tender document.
Precautionary River bank Protection Work to Protect Salimpur Bandar and adjacent area in Batamar Union from km 0.470 to km 0.500 equal 30.00m & km 0.580 to km 0.615 equal 35.00m Total 65.00m from the erosion of Arialkhan river in Muladi Upazila District Barisal under Barishal O&M Division BWDB Barishal during the year 2020-21.