As Per TDS.
Moblization & De-moblization With Loading Un-loading The M.S Shore Pipe 450 mm Dia 6m Long Quantity 175 Nos For Dredging/Filling work of Costal Embankment Bed Devlopment Of River/Country Site At Satkhira Shamnagar Ashsuni Upozilla & Khulna Kaira Upzila Under Khulna Dredger Operation Division BWDB Lobonchara Khulna During Year 2020-21