1. The Tenderer shall submit updated Trade License, Income Tax Certificate and VAT Registration Certificate.
2. A satisfactory completion of similar nature of construction works of at least Tk. 25,00,000.00 (Twenty Five Lac) only under 1 (one) contract over the period of last 3 (three) years.
3. Average Annual Turnover shall be greater than or equal to Tk. 60 Lac (Taka Sixty Lac only) over the best 3 (three) years in last 5 (five) years.
4. Minimum amount of Liquid Asset i.e. Working Capital (Last 6 months bank statement) or credit facility (mentioning the name of the work) of the Tenderer shall be greater than or equal to Taka 40,00,000.00 (Forty Lac) only.
Painting of three HSD storage tanks, five water storage tanks, tank stairs, railing, fire fighting pipe line and related equipments, two degasifier towers, gratings of surface drain and other structures of Khulna 225 MW Combined Cycle Power Plant at Khulna.