App ID : 171090 Tender/Proposal ID : 549471
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 224319200 Project Name : Rehabilitation of 3 Nos Project in Upazila-Dhamoirhat, Patnitala & Mohadevpur, District-Naogaon and Bank Protection Project Including Dredging of Atrai River.
Tender/Proposal Package No. and Description : Nao-W-15
Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15
Category : Construction work for water projects; Works for complete or part construction and civil engineering work;
Scheduled Tender/Proposal Publication
Date and Time :
22-Feb-2021 16:00 Tender/Proposal Document last selling /
downloading Date and Time :
30-Mar-2021 16:00
Pre - Tender/Proposal meeting Start
Date and Time :
23-Feb-2021 10:00 Pre - Tender/Proposal meeting End
Date and Time :
28-Mar-2021 16:00
Tender/Proposal Closing
Date and Time :
31-Mar-2021 13:00 Tender/Proposal Opening
Date and Time :
31-Mar-2021 13:00
Last Date and Time for Tender/Proposal Security
Submission :
31-Mar-2021 12:00    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

A) The Tenderer shall submit with its Tender the following additional documents: 1) Valid Trade Licence, TIN number, VAT Registration, Nationality, Power of attorney (In case of JVCA) & Business address, Declaration about legal capacity to enter in to the contract. 2) Work plan, Statement of work method, Equipment & Personnel.
(B) Special Instruction: 1) In case of working certificate/ Perfermance certificate/ Payment certificate, name of works, planned commencement date and planned completion date and also actual completion date should be mention/ write down on the certificates. It is better to submit the certificate guided by CPTU (uploaded in Section-8). 2) The work of the package may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained for cancellation of the tender/Issuance of work order. 3) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB. 4) Payment will be made subject to the availability of fund. No claim in this regard will be entertained. 5) Continuation of work could not be hampered by the bidder showing the cause of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2008. 6) If the Tenderer(s) submit(s) any false/incorrect or forged certificate, the tender will be outright rejected and action as per PPR-2008 will be initiated. 7) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever. 8) Letter of Commitment for Bank Undertaking for Line of Credit must be submitted in the specific form PW3-7 (uploaded in Section-8). Otherwise tender will be non-responsive. 9) The tenderer has arrange the land for execution of works by his/her own cost.

Brief Description of Works :

Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 4000
Mode of Payment :
Tender/Proposal Security Valid Up to : 27-Jul-2021
Tender/Proposal Valid Up to : 29-Jun-2021
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
Nao-W-15 Dredging of Atrai River from km 2.000 to km 11.000= 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila: Dhamoirhat, Patnitala & Mohadevpur District: Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB, Naogaon During the FY-2020-21. ( Package No: Nao-W-15 ) Dhamuirhat 7200000 02-May-2021 31-May-2022
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Arifuzzaman Khan Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Naogaon
City: Naogaon
Thana: Naogaon Sadar
District: Naogaon - 6500
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 0741-62791
Fax No: 0741-62791
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  2 
Amendment / Corrigendum Text :

Amendment/ Corrigendum 

Field Name Old Value New Value
Document last selling date & time 23/03/2021 16:00 30/03/2021 16:00
Opening Date & Time 24/03/2021 16:30 31/03/2021 13:00
Meeting End Date & Time 16/03/2021 16:00 28/03/2021 16:00
Last date & time for Tender/Proposal Security Submission 24/03/2021 15:00 31/03/2021 12:00
Closing Date & Time 24/03/2021 16:30 31/03/2021 13:00
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Corrigendum

Field Name Old Value New Value
Eligibility of Consultant

A) The Tenderer shall submit with its Tender the following additional documents: 1) Valid Trade Licence, TIN number, VAT Registration, Nationality, Power of attorney (In case of JVCA) & Business address, Declaration about legal capacity to enter in to the contract. 2) Work plan, Statement of work method, Equipment & Personnel.
(B) Special Instruction: 1) In case of working certificate/ Perfermance certificate/ Payment certificate, name of works, planned commencement date and planned completion date and also actual completion date should be mention/ write down on the certificates. It is better to submit the certificate guided by CPTU (uploaded in Section-8). 2) The work of the package may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained for cancellation of the tender/Issuance of work order. 3) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB. 4) Payment will be made subject to the availability of fund. No claim in this regard will be entertained. 5) Continuation of work could not be hampered by the bidder showing the cause of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2008. 6) If the Tenderer(s) submit(s) any false/incorrect or forged certificate, the tender will be outright rejected and action as per PPR-2008 will be initiated. 7) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever. 8) Letter of Commitment for Bank Undertaking for Line of Credit must be submitted in the specific form PW3-7 (uploaded in Section-8). Otherwise tender will be non-responsive. 9) The tenderer has arrange the land for execution of works by his/her own cost.

A) The Tenderer shall submit with its Tender the following additional documents: 1) Valid Trade Licence, TIN number, VAT Registration, Nationality, Power of attorney (In case of JVCA) & Business address, Declaration about legal capacity to enter in to the contract. 2) Work plan, Statement of work method, Equipment & Personnel.
(B) Special Instruction: 1) In case of working certificate/ Perfermance certificate/ Payment certificate, name of works, planned commencement date and planned completion date and also actual completion date should be mention/ write down on the certificates. It is better to submit the certificate guided by CPTU (uploaded in Section-8). 2) The work of the package may be totally dropped, decreased or increased as per field condition/design/administrative approval/budget allocation for which no claim will be entertained for cancellation of the tender/Issuance of work order. 3) Work order will be issued after obtaining budget allocation & prior approval from the competent authority of BWDB. 4) Payment will be made subject to the availability of fund. No claim in this regard will be entertained. 5) Continuation of work could not be hampered by the bidder showing the cause of insufficient Budget Provision & Fund Allocation. The work must be completed within the stipulated time failure of which action will be taken as per Tender Clause & PPR-2008. 6) If the Tenderer(s) submit(s) any false/incorrect or forged certificate, the tender will be outright rejected and action as per PPR-2008 will be initiated. 7) The Procuring entity reserves the right to accept or reject any or all Tenders without assigning any reason whatsoever. 8) Letter of Commitment for Bank Undertaking for Line of Credit must be submitted in the specific form PW3-7 (uploaded in Section-8). Otherwise tender will be non-responsive. 9) The tenderer has arrange the land for execution of works by his/her own cost.

TDS/PDS--A. General--

The PE is [state name of PE]

The PE is BANGLADESH WATER DEVELOPMENT BOARD, Represented by: Executive Engineer, Naogaon O&M Division, BWDB, Naogaon.

The Name of the Tender is:Tender ID No. 549471
Brief Description of the Works:Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15

Tender Ref:EE/NO&MD/DA-2/566, Date 16-02-2021

Lot No(s):Nao-W-15

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

The PE is [state name of PE]

The PE is BANGLADESH WATER DEVELOPMENT BOARD, Represented by: Executive Engineer, Naogaon O&M Division, BWDB, Naogaon.

The Name of the Tender is:Tender ID No. 549471
Brief Description of the Works:Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15

Tender Ref:EE/NO&MD/DA-2/625, Date 20-02-2021

Lot No(s):Nao-W-15

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

TDS/PDS--C. Qualification Criteria--

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [3 state number] years.

[a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [one (1) state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [5 state number] years, each with a value of at least Tk. [1800.00 state amount] Lakh.

Similar contracts as defined under:
1. Dredging of River by operating dredger.

[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
 

[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package]
[the minimum value of the similar works is recommended to be between 50 and 75 percent of the estimated cost of the proposed work]

 

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 (three) years.

[a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]

 

The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least one (1) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (five) years, each with a value of at least Tk. 1300.00 Lakh.

Similar contracts as defined under:
1. Dredging of River by operating dredger.

[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
 

[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package]
[the minimum value of the similar works is recommended to be between 50 and 75 percent of the estimated cost of the proposed work]

 

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [3500.00 insert amount] Lakh over the last [of best three (3) years in the last five (5) years state number] years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

  

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [900.00 state amount] Lakh.

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

The required average annual construction turnover shall be greater than Tk 3000.00 Lakh of best three (3) years in the last five (5) years.

[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
Example:


Estimated Contract Value: Tk 24 Cr.
Contract period: 18 months
Estimated Annual Cash Flow: Tk 16 Cr.
Required average annual construction turn over: Tk 24 Cr., using a multiplier of 1.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

  

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 900.00 Lakh.

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:


Contract Value: Tk 24 Cr.
Contract period: 18 months
Assuming work time: 1 month
Invoice period: 0.5 month
Certification Time: 0.5 month
Contingency Time: 1 month

Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]

 

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:Tk 1900.00 Lakh [70%-80% of the official estimated cost].
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

The minimum capacity shall be:Tk 1800.00 Lakh [70%-80% of the official estimated cost].
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
Note 2: In case of JV tender capacity requirement for leading partner shall be minimum 40% and for other partners shall be minimum 25%.
 

TDS/PDS--C. Qualification Criteria--

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:

 

No Position Total Works Experience (years) In Similar
Works
Experience
(years)
 
1 Construction Project Manager (At least B.Sc Engineer (Civil)) -1 (One) no Minimum 5 (five) years. Minimum 3 (three) years
2 Diploma-in-Civil Engineering- 2 (Two) nos Minimum 5 (five) years. Minimum 3 (three) years
3 Surveyor (Diploma-in-Surveying)–1(One) nos. Minimum 5 (five) years. Minimum 3 (three) years
4 Supervisor (H.S.C.) - 2 (Two) nos Minimum 5 (five) years. Minimum 3 (three) years
5 Mechanics (Trade) - 2 (two) nos Minimum 5 (five) years. Minimum 3 (three) years
6 Electricians. - 1 no Minimum 5 (five) years. Minimum 3 (three) years
7 Dredger Operator- 5 nos Minimum 5 (five) years. Minimum 3 (three) years

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

[ qualification of an alternative Construction Project Manager may also be requested]
[ for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package]
 

A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:

 

No Position Total Works Experience (years) In Similar
Works
Experience
(years)
 
1 Construction Project Manager (At least B.Sc Engineer (Civil)) -1 (One) no Minimum 5 (five) years. Minimum 3 (three) years
2 Diploma-in-Civil Engineering- 2 (Two) nos Minimum 5 (five) years. Minimum 3 (three) years
3 Surveyor (Diploma-in-Surveying)–1(One) nos. Minimum 5 (five) years. Minimum 3 (three) years
4 Supervisor (H.S.C.) - 2 (Two) nos Minimum 5 (five) years. Minimum 3 (three) years
5 Mechanics (Trade) - 2 (two) nos Minimum 5 (five) years. Minimum 3 (three) years
6 Electricians. - 1 no Minimum 5 (five) years. Minimum 3 (three) years
7 Dredger Operator- 3 nos Minimum 5 (five) years. Minimum 3 (three) years

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

[ qualification of an alternative Construction Project Manager may also be requested]
[ for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package]
 

TDS/PDS--C. Qualification Criteria--

Tenderer shall own or have proven access to hire or lease of the major construction  equipments, in full working order as follows :

 

No Equipment Type and Characteristics Minimum Number
Required
 
1 Operating dredger 18" 5 Nos
2 Water pump 2 Nos
3 Excavator 3 Nos
4 Concrete Mixer Machine 2 Nos
5 Vibrator 2 Nos
6 Power Supply Generator 2 Nos
7 Levelling instrument 4 Nos
8 Drone 1 Nos
9 Booster pump 5 Nos

 

 [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary  for each lot in the package, subject to the nature of the control required over each package]

Tenderer shall own or have proven access to hire or lease of the major construction  equipments, in full working order as follows :

 

No Equipment Type and Characteristics Minimum Number
Required
 
1 Operating dredger 18" 3 Nos
2 Water pump 2 Nos
3 Excavator 3 Nos
4 Concrete Mixer Machine 2 Nos
5 Vibrator 2 Nos
6 Power Supply Generator 2 Nos
7 Levelling instrument 4 Nos
8 Drone 1 Nos
9 Booster pump 3 Nos

 

 [for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary  for each lot in the package, subject to the nature of the control required over each package]

TDS/PDS--C. Qualification Criteria--

 

TDS Clauses References Requirements by summation Requirements for Lead Partner of JVCA Requirements for other Partner(s) of JVCA
ITT-15.1(a) Summation not applicable Same as stated in TDS Same as for
Leading Partner
 
ITT-15.1(b) 100% At least one Contract Minimum requirement not applicable
ITT-16.1(a) 100% 40% 25%
ITT-16.1(b) 100% 40% 25%
ITT-17.1 100% Minimum requirement not applicable Minimum requirement not applicable
ITT-18.1 100% Minimum requirement not applicable Minimum requirement not applicable

 

The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk [300.00 state amount]
[the value of the non-judicial stamp shall be Tk.300.00]
 

 

TDS Clauses References Requirements by summation Requirements for Lead Partner of JVCA Requirements for other Partner(s) of JVCA
ITT-15.1(a) Summation not applicable Same as stated in TDS Same as for
Leading Partner
 
ITT-15.1(b) 100% At least one Contract Minimum requirement not applicable
ITT-16.1(a) 100% 40% 25%
ITT-16.1(b) 100% 40% 25%
ITT-17.1 100% Minimum requirement not applicable Minimum requirement not applicable
ITT-18.1 100% Minimum requirement not applicable Minimum requirement not applicable

 

The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 
[the value of the non-judicial stamp shall be Tk.300.00]
 

TDS/PDS--D. Tender Preparation--

The prices quoted by the Tenderer shall be fixed for the duration of the Contract.
OR
The prices quoted by the Tenderer shall be adjustable as follows:

Iif prices shall be adjustable, the methodology for adjustment should be specified]
 

The prices quoted by the Tenderer shall be fixed for the duration of the Contract.

TDS/PDS--E. Tender e-Submission--

The deadline for lodgement of e-Tenders is as per Notice.[state time, and identify a.m or p.m, i.e 10.30 a.m]


[state date i,e. 15 june,2011 ].
 

The deadline for lodgement of e-Tenders is as per Notice.



 

TDS/PDS--G. Contract Award--

The amount of Performance Security shall be [5% (Five Percent) state percentage] percent of the Contract Price.

[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ]
 

The amount of Performance Security shall be 5% (Five Percent) percent of the Contract Price.

[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ]
 

Brief Description of Goods,Works or Service

Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15

Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15

 
Save As PDF