Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Amendment/ Corrigendum |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 23/03/2021 16:00 | 30/03/2021 16:00 |
| Opening Date & Time | 24/03/2021 16:30 | 31/03/2021 13:00 |
| Meeting End Date & Time | 16/03/2021 16:00 | 28/03/2021 16:00 |
| Last date & time for Tender/Proposal Security Submission | 24/03/2021 15:00 | 31/03/2021 12:00 |
| Closing Date & Time | 24/03/2021 16:30 | 31/03/2021 13:00 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Eligibility of Consultant | A) The Tenderer shall submit with its Tender the following additional documents: 1) Valid Trade Licence, TIN number, VAT Registration, Nationality, Power of attorney (In case of JVCA) & Business address, Declaration about legal capacity to enter in to the contract. 2) Work plan, Statement of work method, Equipment & Personnel. |
A) The Tenderer shall submit with its Tender the following additional documents: 1) Valid Trade Licence, TIN number, VAT Registration, Nationality, Power of attorney (In case of JVCA) & Business address, Declaration about legal capacity to enter in to the contract. 2) Work plan, Statement of work method, Equipment & Personnel. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | The PE is [state name of PE] The PE is BANGLADESH WATER DEVELOPMENT BOARD, Represented by: Executive Engineer, Naogaon O&M Division, BWDB, Naogaon.
The Name of the Tender is:Tender ID No. 549471 Tender Ref:EE/NO&MD/DA-2/566, Date 16-02-2021 Lot No(s):Nao-W-15
[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities] |
The PE is [state name of PE] The PE is BANGLADESH WATER DEVELOPMENT BOARD, Represented by: Executive Engineer, Naogaon O&M Division, BWDB, Naogaon.
The Name of the Tender is:Tender ID No. 549471 Tender Ref:EE/NO&MD/DA-2/625, Date 20-02-2021 Lot No(s):Nao-W-15
[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [3 state number] years. [a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [one (1) state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [5 state number] years, each with a value of at least Tk. [1800.00 state amount] Lakh.
Similar contracts as defined under:
[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 (three) years. [a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least one (1) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (five) years, each with a value of at least Tk. 1300.00 Lakh.
Similar contracts as defined under:
[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [3500.00 insert amount] Lakh over the last [of best three (3) years in the last five (5) years state number] years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [900.00 state amount] Lakh.
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 3000.00 Lakh of best three (3) years in the last five (5) years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 900.00 Lakh.
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:Tk 1900.00 Lakh [70%-80% of the official estimated cost].
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be:Tk 1800.00 Lakh [70%-80% of the official estimated cost].
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
[ qualification of an alternative Construction Project Manager may also be requested] |
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
[ qualification of an alternative Construction Project Manager may also be requested] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
[for Tenders where the package contains more than one (1) lot, this qualification requirement may be necessary for each lot in the package, subject to the nature of the control required over each package] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk [300.00 state amount] |
The value of non-judicial stamp for execution of the Joint Venture agreement shall be Tk 300.00 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract.
Iif prices shall be adjustable, the methodology for adjustment should be specified] |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender e-Submission-- | The deadline for lodgement of e-Tenders is as per Notice.[state time, and identify a.m or p.m, i.e 10.30 a.m]
|
The deadline for lodgement of e-Tenders is as per Notice.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The amount of Performance Security shall be [5% (Five Percent) state percentage] percent of the Contract Price.
[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ] |
The amount of Performance Security shall be 5% (Five Percent) percent of the Contract Price.
[usually ten(10) percent of the Contract price, however, should not be less than 5% if retention money is kept at least 5% of contract price; Maximum twenty five (25) percent of the total Contract price in case the Tender price is significantly below the updated official estimate or seriously unbalanced as a result of front loading ] |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Brief Description of Goods,Works or Service | Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15 |
Dredging of Atrai River from km 2.000 to km 11.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. Package No Nao-W-15 |