The required annual construction turnover shall be greater than Tk. 75.00 lakh over the last 05 (five) years.
A satisfactory completion of similar works as a RCC Drain Constructions work at least Tk.10.50 lakh under Single of contract over a period of last 05(five) years shall be required years.
Counting backward from the date of publication of IFT in the website. The minimum amount of liquid assets, net of other contractual commitments, is Tk.9.50 lakh.
Note : The Renderer may rent available RHD equipment at the fixed by RHD for the execution of the work.(Ref. Chef Engineer Memo no-1406-pro-pro, Date: 24/02/16)
Construction of Drain, repair and cleaning of existing damaged drain at 8th Km. (P) both side of Dhaka-Narayangonj Link road (R-111) under Narayangonj Road Division during the year 2015-2016.