View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | For correction of Document as per PEDP-3 requirement. |
| Field Name | Old Value | New Value | ||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document last selling date & time | 05/06/2016 16:00 | 12/06/2016 16:00 | ||||||||||||||||||||||||||||||||
| Opening Date & Time | 06/06/2016 15:00 | 13/06/2016 15:00 | ||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The PE is |
The PE is Authorized representative is Md. Rafiqul Islam, SAE, LGED, Dhobaura |
||||||||||||||||||||||||||||||||
| PCC--A. General-- | The Start Date shall be 14-Aug-2016.
|
The Start Date shall be 14-Aug-2016.
GCC 39.2(b) please read the following instead of existing:
GCC 39.2(c) please read the following instead of existing:
GCC 39.2(d) please read the following instead
GCC 39.2(e) please read the following in addition to the existing: |
||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The PE is: Telephone: 09034-56041 Email: ue.dhobaura@lged.gov.bd
The Development Partners are:
Asian Development Bank (ADB) |
The PE is: Telephone: 09034-56041 Email: ue.dhobaura@lged.gov.bd Authorized representative is Md. Rafiqul Islam, SAE, LGED, Dhobaura
The Development Partners are:
Asian Development Bank (ADB) |
||||||||||||||||||||||||||||||||
| PCC--A. General-- | Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date(s);
[state date or dates of possession of site] |
Possession of the Site or part(s) of the Site, to the Contractor shall be given on the following date 14-Aug- 2016. |
||||||||||||||||||||||||||||||||
| PCC--A. General-- | Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;
[insert name(s)] |
Following Key Personnel to carry out the functions stated in the Schedule shall be employed by the Contractor;
Project Manager and Project Engineer. |
||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The Sectional Completion Dates are: N/A. |
The Sectional Completion Dates are: N/A. |
||||||||||||||||||||||||||||||||
| PCC--A. General-- | The Contractual matters between the PE and the Contractor shall be decided by Not Applicable |
The Contractual matters between the PE and the Contractor shall be decided by Project Engineer. |
||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The PEâ??s address for the purpose of communications under this contract is :
|
The PE’s address for the purpose of communications under this contract is :
Mohammad Shahinur Ferdoush
|
||||||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
The minimum insurance cover shall be:
|
||||||||||||||||||||||||||||||||
| PCC--A. General-- | Other documents forming part of the Contract are: Work Plan |
Other documents forming part of the Contract are: See Section- 8 |
||||||||||||||||||||||||||||||||
| PCC--B. Time Control-- | Commencement Date of Works shall be as follows;
[insert different commencement dates for different parts of the Works, if deemed appropriate] |
Commencement Date of Works shall be as follows;
14-Aug-2016. |
||||||||||||||||||||||||||||||||
| PCC--B. Time Control-- | The period between Programme updates is quarterly.
|
The period between Programme updates is Monthly.
|
||||||||||||||||||||||||||||||||
| PCC--B. Time Control-- | The amount to be withheld for late submission of an updated Programme is Tk.100000.00 (Tk. One Lakh) |
The amount to be withheld for late submission of an updated Programme is Tk.1000.00 (Tk. One Thousand) |
||||||||||||||||||||||||||||||||
| PCC--B. Time Control-- | The Contractor shall submit a Programme for the Works within 14 days of signing the Contract.
|
The Contractor shall submit a Programme for the Works within 7 days of signing the Contract.
|
||||||||||||||||||||||||||||||||
| PCC--C. Quality Control-- | The Defects Liability Period is twelve (12) months.
|
The Defects Liability Period is 12 (twelve) months.
|
||||||||||||||||||||||||||||||||
| PCC--D. Cost Control-- | The amount of Liquidated Damages or in other words Delay Damages for the incomplete Works or any part thereof is 0.01 (Zero point zero one) percent of its Contract price per day of delay.
|
The amount of Liquidated Damages or in other words Delay Damages for the incomplete Works or any part thereof is 0.01 (Zero point zero one) percent of its Contract price per day of delay. Guide to application of GCC Sub Clause 76.1 above The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10 (Ten) percent of the final Contract price of the whole of the Works. |
||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The date by which â??as-builtâ?� drawings are required is [insert date]
The date by which operating and maintenance manuals are required is [insert date] |
The date by which “as-built” drawings are required is 11-June-2017. The date by which operating and maintenance manuals are required is 11-June-2017. |
||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The amount to be withheld for failing to produce â??as-builtâ?� drawings and/or operating and maintenance manuals by the date required is Tk [insert amount]
[usually a very nominal amount] |
The amount to be withheld for failing to produce “as-built” drawings and/or operating and maintenance manuals by the date required is Tk 500.00 (Five Hundred)
|
||||||||||||||||||||||||||||||||
| PCC--F. Termination and Settlement of Disputes-- | The percentage to apply to the contract value of the works not completed, representing the PEâ??s additional cost for completing the uncompleted Works, is 10(Ten) percent.
|
The percentage to apply to the contract value of the works not completed, representing the PE’s additional cost for completing the uncompleted Works, is 20(Twenty) percent.
|
||||||||||||||||||||||||||||||||
| PCC--G. Claims, Disputes and Arbitration-- |
The Adjudicator jointly appointed by the parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the Secretary, Local Government Division, Ministry of Local Government, Rural Development & Cooperative, Bangladesh Secretariat, Dhaka, Bangladesh. |
The Adjudicator jointly appointed by the parties is:
In case of disagreement between the parties, the Appointing Authority for the Adjudicator is the President of the Institution of Project Managers, Bangladesh. |
||||||||||||||||||||||||||||||||
| Meeting End Date & Time | 26/05/2016 17:00 | 02/06/2016 17:00 | ||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 06/06/2016 13:00 | 13/06/2016 13:00 | ||||||||||||||||||||||||||||||||
| Closing Date & Time | 06/06/2016 14:00 | 13/06/2016 14:00 | ||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | The name of the Development Partners are:
Asian Development Bank (ADB) |
The names of the development Partners are:
ITT 4.2(b) please read the following instead of existing:
ITT 4.2(c) please read the following instead of existing:
ITT 4.2(d) please read the following instead of existing:
ITT 4.2(e) please read the following in addition to the existing:
ITT 4.3 Please read the following instead of existing:
ITT 5.13 This is a new ITT
ITT 13.1 Please read the text instead of existing
ITT 16(b) please read the following instead of existing: |
||||||||||||||||||||||||||||||||
| TDS/PDS--A. General-- | The source of public funds is
Government, Aid or Grant. |
The source of public funds is GoB and 9 other Development Partners. |
||||||||||||||||||||||||||||||||
| TDS/PDS--B. e-Tender Document (e-TD)-- | Pre- Tender meeting Starts 19/05/2016 11:00 , Ends 26/05/2016 17:00 |
As per mention in Tender Notice. |
||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 years. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 years, each with a value of at least Tk. 4000000.00.
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 years. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 years, each with a value of at least Tk. 5500000.00 (Fifty Five Lakh) only.
|
||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 10000000.00 over the last 5 years. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 2000000.00
|
The required average annual construction turnover shall be greater than Tk 10000000.00 (One Crore) over the last 5 years. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 2000000.00 (Twenty Lakh)
|
||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
|
A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
|
||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : |
The minimum qualification requirements of Leading Partner and other Partner(s) of a JVCA shall be as follows : See ITT 19.1 |
||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- | The Tenderer shall submit with its Tender the following additional documents:
|
The Tenderer shall submit with its Tender the following additional documents: None |
||||||||||||||||||||||||||||||||
| TDS/PDS--D. Tender Preparation-- |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract. |
The prices quoted by the Tenderer shall be fixed for the duration of the Contract. |
||||||||||||||||||||||||||||||||
| TDS/PDS--E. Tender e-Submission-- | The deadline for lodgement of e-Tenders is 06-Jun-2016 14:00
|
The deadline for lodgement of e-Tenders is :As per Tender Notice.
|
||||||||||||||||||||||||||||||||
| TDS/PDS--G. Contract Award-- | The amount of Performance Security shall be 5 (Five) percent of the Contract Price.
|
The amount of Performance Security shall be 5 to 25 percent of the Contract Price. * The amount of Performance Security shall be given Through the prescribed form which are Attached in Section 8.
|