All e-GP enlisted valied tenderer.
Repair of Katakhali regulator at km 5.73(2v-1.50mX1.80m), Narainkhali regulator at km 9.00(2v-1.50mX1.80m), Tarai regulator at km 15.95(2v-1.50mX1.80m), Fulbari regulator at km 20.11(1v-1.50mX1.80m) in Polder No.03 and Raghunathpur regulator at km 20.55(2v-1.50mX1.20m), Silna regulator at km 27.50(2v-1.50mX1.20m) in polder no.02 in connection with Tarail-Pachuria Flood Control, Drainage & Irrigation Project (2nd Phase)during the Year 2013-14.