View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | This IFT is open for all eligible Reputed Contractors who have the following eligibility Criteria as mentioned below: (a). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last five (05) years with a value of at least Tk 45.00 Lac of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows: In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. (b). The required Average Annual Construction Turnover shall be greater than Tk 38.00 Lac for within the last five (03) years. (c). The minimum amount of liquid assets or working capital or credit facilities shall be Tk 52.00 Lac. Document submitted along with the tender must be issued in between publication date and submission date of the tender. (d) Up-to-date valid Trade License, Income Tax Clearance Certificate from the NBR with TIN & e-BIN Certificate (e) Other required eligibility and conditions of the tenderer are shown in TDS & PCC of tender documents. |
This IFT is open for all eligible Reputed Contractors who have the following eligibility Criteria as mentioned below: (a). The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction of similar nature of works, (Wooden & Steel furniture) i.e. any Wooden & Steel furniture manufacture successfully completed within the last five (05) years with a value of at least Tk 45.00 Lac of Government/ Semi-Government/ Autonomous Bodies in Bangladesh. i.e. years counting backward from the date of publication of IFT in the e-GP System. The above experience/ work completion certificate shall have to be submitted as follows:
In case of the work done under PWD, the certifying and authenticating authority shall be the concerned Executive Engineer. (b). The required Average Annual Construction Turnover shall be greater than Tk 38.00 Lac for within the last five (03) years. (c). The minimum amount of liquid assets or working capital or credit facilities shall be Tk 52.00 Lac. Document submitted along with the tender must be issued in between publication date and submission date of the tender. (d) Up-to-date valid Trade License, Income Tax Clearance Certificate from the NBR with TIN & e-BIN Certificate (e) Other required eligibility and conditions of the tenderer are shown in TDS & PCC of tender documents. |
| PCC--A. General-- |
The Procuring Entity is |
The Procuring Entity is Executive Engineer, PWD E/M Wood Workshop Division, S. B. Nagar, Dhaka. |
| PCC--A. General-- |
The Project Manager is |
The Project Manager is Sub-Divisional Engineer, PWD Wood Workshop Sub-Division, Mirpur, Dhaka. |
| PCC--A. General-- |
The Site is located at [location] and is defined in drawings No: |
The Site is located at Chittagong. |
| PCC--A. General-- |
The Works consist of |
The Works consist of as per BOQ & Notice |
| PCC--A. General-- | Other documents forming part of the Contract are;
[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.] |
Other documents forming part of the Contract are as per notice and pcc. |
| PCC--A. General-- | Possession of the Site to the Contractor shall be given on the following date;
[state date of possession of site] |
Possession of the Site to the Contractor shall be given on the following date; within 03 (Three) days from the date of signing contract. |
| PCC--B. Time Control-- |
The Start Date shall be [insert date ] |
The Start Date shall be as per contract agreement |
| PCC--B. Time Control-- |
The Intended Completion Date for the whole of the Works shall be [insert date] |
|
| PCC--B. Time Control-- |
The Contractor shall submit a Programme for the Works within [insert days] days of signing the Contract. |
The Contractor shall submit a Programme for the Works within 3 (Three) days of signing the Contract. |
| PCC--C. Quality Control-- |
The Defects Liability Period is [state months] |
The Defects Liability Period is 12 month |
| PCC--D. Cost Control-- |
The following additional events shall also be the Compensation Events: |
The following additional events shall also be the Compensation Events: n/a |
| PCC--D. Cost Control-- | The proportion of payments to be retained is [insert percent] percent. |
The proportion of payments to be retained is 10 percent. |
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
The amount of Liquidated Damages or in other words Delay Damages is 10 percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
| PCC--D. Cost Control-- |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works. |
The maximum amount of Liquidated Damages for the uncompleted Works or any part there of is 10 percent |
| PCC--F. Termination-- | The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 20 percent. |
| PCC--H. Disputes and Settlement-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below; Office of Superintending Engineer, PWD E/M Circle-3. dhaka |
| Brief Description of Goods,Works or Service | Manufacturing Supplying & fixing furniture at Sandwip Upazila in Chittagong District under project of Establishment of 40 forty Technical training centre TTC at Upazila level and 01 one Institute of Marine Technology IMT at Chittagong Group no-02 |
Manufacturing Supplying & fixing furniture at Sandwip Upazila in Chittagong District under project of Establishment of 40 forty Technical training centre TTC at Upazila level and 01 one Institute of Marine Technology IMT at Chittagong Group no-02 |