View IFT /PQ / REOI / RFP Notice Details
Amendment / Corrigendum No. : 2
|
|
Amendment / Corrigendum Text : | Amendment of Section 6. Bill of Quantities ( Iteam No-20)
Existing Clause: Recovery of angle stay: Excavation of earth as necessary, up-rooting of complete stay rod assembly. The un-binding / unbolting and lowering of the stay wire and attachment from the point at attachment to the pole and the back-filling and ramming of the excavation. Also includes carrying the recovered materials site to dept store.
Amendment Clause: Installation of Angle Stay: Excavation as per drawing (MS-00029) and direction of the Engineer in charge and installation of stay rod, stay insulator and pole fittings, back-filling and ramming of excavation, the installation tensioning and any other approved method making off of the stay wire to stay rod & also includes carrying of this materials from dept. Store to site.
All others quantity and unit will remain unchanged. |
Field Name | Old Value | New Value |
---|---|---|
Document last selling date & time | 11/07/2021 17:00 | 18/07/2021 17:00 |
Opening Date & Time | 12/07/2021 11:00 | 19/07/2021 11:00 |
Last date & time for Tender/Proposal Security Submission | 12/07/2021 09:00 | 18/07/2021 17:00 |
Closing Date & Time | 12/07/2021 11:00 | 19/07/2021 11:00 |
Amendment / Corrigendum No. : 1
|
|
Amendment / Corrigendum Text : |
ITT Clause 10.(c) (The Minimum Tender Capacity as specified in the TDS) will be amended as follows: |
Field Name | Old Value | New Value |
---|---|---|
Eligibility of Consultant | As per TDS. |
As per TDS. |
Brief Description of Goods,Works or Service | Line Construction Works of 11KV 11/0.4KV 0.4KV & 0.23KV lines & installation of distribution transformersunder S&D-Santahar Bogura Package-42 Lot-2 |
Line Construction Works of 11KV 11/0.4KV 0.4KV & 0.23KV lines & installation of distribution transformersunder S&D-Santahar Bogura Package-42 Lot-2 |