1) Similar Specific work (one work) min.= 20,00000.00 tk
2) Avg. Anual Construction turn over minimum = 53,00000.00 tk
3) Liquid Asset minimum =7,00000.00 tk
Construction of additional class room of Hasan Khor Primary School in Palashbari,Gaibandha.