Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Some information added in TDS and PCC clause. |
| Field Name | Old Value | New Value | ||||
|---|---|---|---|---|---|---|
| Document last selling date & time | 07/07/2021 17:00 | 11/07/2021 17:00 | ||||
| Eligibility of Consultant | As per Tender Data Sheet (TDS) |
As per Tender Data Sheet (TDS) |
||||
| Opening Date & Time | 08/07/2021 14:00 | 12/07/2021 14:00 | ||||
| PCC--A. General-- |
The Procuring Entity is Jayanta Mallick |
The Procuring Entity is Executive Engineer,DPHE,Bagerhat District, Bagerhat |
||||
| PCC--A. General-- |
The Project Manager is Jayanta Mallick |
The Project Manager is N/A |
||||
| PCC--A. General-- |
The Site is located at [location] and is defined in drawings No: As per IFT |
The Site is located at Morrelganj and is defined in drawings No: N/A |
||||
| PCC--A. General-- |
The Works consist of platform, construction, tank etc |
The Works consist of platform, construction, tank etc |
||||
| PCC--A. General-- | Other documents forming part of the Contract are;
[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.] |
Other documents forming part of the Contract are; N/A
[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.] |
||||
| PCC--A. General-- | Possession of the Site to the Contractor shall be given on the following date; 15 days after contract sign
[state date of possession of site] |
Possession of the Site to the Contractor shall be given on the following date; 15 days after contract sign
|
||||
| PCC--B. Time Control-- |
The Start Date shall be [insert date ] As per IFT |
The Start Date shall be As per IFT |
||||
| PCC--B. Time Control-- |
The Intended Completion Date for the whole of the Works shall be [insert date] |
The Intended Completion Date for the whole of the Works shall be As per IFT |
||||
| PCC--B. Time Control-- |
The Contractor shall submit a Programme for the Works within 10 days of signing the Contract. |
The Contractor shall submit a Programme for the Works within 10 days of signing the Contract. |
||||
| PCC--C. Quality Control-- |
The Defects Liability Period is [state months] twelve (12) months |
The Defects Liability Period is twelve (12) months |
||||
| PCC--D. Cost Control-- |
The following additional events shall also be the Compensation Events: |
The following additional events shall also be the Compensation Events: none |
||||
| PCC--D. Cost Control-- | The proportion of payments to be retained is [insert percent] percent. |
The proportion of payments to be retained is 10 percent of the Works under the Contract. |
||||
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
The amount of Liquidated Damages or in other words Delay Damages is 0.1 percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
||||
| PCC--D. Cost Control-- |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works. |
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10 percent of the final Contract price of the whole of the Works. |
||||
| PCC--F. Termination-- | The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 20 percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 20 percent.
|
||||
| PCC--H. Disputes and Settlement-- |
The arbitration shall be conducted in the place mentioned below; |
The arbitration shall be conducted in the place mentioned below; |
||||
| Meeting End Date & Time | 04/07/2021 17:00 | 07/07/2021 17:00 | ||||
| Last date & time for Tender/Proposal Security Submission | 08/07/2021 13:59 | 12/07/2021 13:59 | ||||
| Start Date(Lot No : 01) | 15/07/2021 | 25/07/2021 | ||||
| Closing Date & Time | 08/07/2021 14:00 | 12/07/2021 14:00 | ||||
| TDS/PDS--A. General-- |
|
The Procuring Entity is Executive Engineer,DPHE,Bagerhat District, Bagerhat
|
||||
| TDS/PDS--B. Tender Document-- | Allowed to post clarification till [Date and Time] n/a |
Allowed to post clarification till is N/A |
||||
| TDS/PDS--C. Qualification Criteria-- | The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 20 lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 20 lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.] |
||||
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:Tk.24 lac
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
The minimum capacity shall be:Tk.24 lac
Where
For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package |
||||
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 40 lac over the last 05 years. |
The required average annual construction turnover shall be greater than Tk 40 lac over the last 05 years. |
||||
| TDS/PDS--C. Qualification Criteria-- | A satisfactory completion of similar works of rain water harvesting work of at least Tk 20 lac under 01 of contract over a period of 05 years shall be required. |
A satisfactory completion of similar works of rain water harvesting work of at least Tk 20 lac under 01 of contract over a period of 05 years shall be required. |
||||
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents: n/a |
Tenderer shall submit with its Tender, the following additional documents:
Following Updated Documents: |
||||
| TDS/PDS--D. Tender Preparation-- | The Tender Validity period shall be120 days.
[normally 60 to 90 days deemed reasonable] |
The Tender Validity period shall be120 days. |
||||
| TDS/PDS--D. Tender Preparation-- |
The amount of the Tender Security shall be As per IFT |
The amount of the Tender Security shall be As per IFT |
||||
| TDS/PDS--E. e-Tender Submission-- |
The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m] |
The deadline for lodgment of e-Tenders is As per IFT |
||||
| Brief Description of Goods,Works or Service | Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021 |
Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila For Landless and Houseless Family Through Mujib Barsho In Bagerhat District Under Revenue Budget FY-2020-2021 |