View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Department of Public Health Engineering (DPHE) Procuring Entity Name : Office of the Executive Engineer,DPHE Bagerhat
Procuring Entity Code : PE Code -008 Procuring Entity District : Bagerhat
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 46.03.0100.061.14.172.16.1030 Dated-20/6/21 Tender/Proposal Status :
App ID : 169133 Tender/Proposal ID : 590225
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Revenue
Source of Funds : Government
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : MBTW-2605
Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021
Category : Collected and purified water; Construction work; Public utilities;Natural water;Drinking water;Non-drinking water;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator;Water distribution and related services;Water distribution;Operation of a water-purification plant;Operation of water supplies;Gas distribution and related services;Gas distribution;Electricity distribution and related services;Electricity distribution;Operation of electrical installations;Other sources of energy supplies and distribution;Operation of a power plant;Meter reading service
Scheduled Tender/Proposal Publication
Date and Time :
23-Jun-2021 11:00 Tender/Proposal Document last selling /
downloading Date and Time :
11-Jul-2021 17:00
Pre - Tender/Proposal meeting Start
Date and Time :
24-Jun-2021 11:00 Pre - Tender/Proposal meeting End
Date and Time :
07-Jul-2021 17:00
Tender/Proposal Closing
Date and Time :
12-Jul-2021 14:00 Tender/Proposal Opening
Date and Time :
12-Jul-2021 14:00
Last Date and Time for Tender/Proposal Security
Submission :
12-Jul-2021 13:59    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As per Tender Data Sheet (TDS)

Brief Description of Works :

Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila For Landless and Houseless Family Through Mujib Barsho In Bagerhat District Under Revenue Budget FY-2020-2021

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 1000
Mode of Payment :
Tender/Proposal Security Valid Up to : 07-Dec-2021
Tender/Proposal Valid Up to : 09-Nov-2021
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
01 Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021 Morrelganj 85000 25-Jul-2021 30-Nov-2021
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : PE Bagerhat Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Office of the Executive Engineer,DPHE Bagerhat
City: Bagerhat
Thana: Bagerhat Sadar
District: Bagerhat - 9300
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 04-6862410
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Some information added in TDS and PCC clause.

Field Name Old Value New Value
Document last selling date & time 07/07/2021 17:00 11/07/2021 17:00
Eligibility of Consultant

As per Tender Data Sheet (TDS)

As per Tender Data Sheet (TDS)

Opening Date & Time 08/07/2021 14:00 12/07/2021 14:00
PCC--A. General--

The Procuring Entity is Jayanta Mallick
executive engineer, dphe,bagerhat
e-mail-pe.bagerhat@dphe.gov.bd
Tel-0468-62410
[Name, address]

The Procuring Entity is Executive Engineer,DPHE,Bagerhat District, Bagerhat

PCC--A. General--

The Project Manager is Jayanta Mallick
executive engineer, dphe,bagerhat
e-mail-pe.bagerhat@dphe.gov.bd
Tel-0468-62410
[Name, address]

The Project Manager is N/A

PCC--A. General--

The Site is located at [location] and is defined in drawings No: As per IFT
[insert numbers]
 

The Site is located at Morrelganj  and is defined in drawings No: N/A

 

PCC--A. General--

The Works consist of platform, construction, tank etc
[state brief summary]

The Works consist of platform, construction, tank etc
 

PCC--A. General--

Other documents forming part of the Contract are;

[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]
 

Other documents forming part of the Contract are; N/A

[list other documents viz. Site Investigation Reports, relevant correspondences prior to signing of the Contract agreement etc.]
 

PCC--A. General--

Possession of the Site to the Contractor shall be given on the following date; 15 days after contract sign

[state date of possession of site]
 

Possession of the Site to the Contractor shall be given on the following date; 15 days after contract sign


 

PCC--B. Time Control--

The Start Date shall be [insert date ] As per IFT
[it is the last date when the Contractor shall commence execution of the Works under the Contract]
 

The Start Date shall be As per IFT

 

PCC--B. Time Control--

The Intended Completion Date for the whole of the Works shall be [insert date]
[to be calculated from the start Date] As per IFT
 

The Intended Completion Date for the whole of the Works shall be As per IFT
 

PCC--B. Time Control--

The Contractor shall submit a Programme for the Works within 10 days of signing the Contract.
[usually ten (10) days or may be less]
 

The Contractor shall submit a Programme for the Works within 10 days of signing the Contract.
 

PCC--C. Quality Control--

The Defects Liability Period is [state months] twelve (12) months
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is   twelve (12) months

 

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:
[list events or state none ]
 

The following additional events shall also be the Compensation Events:  none
 

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.

The proportion of payments to be retained is 10 percent of the Works under the Contract.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is 0.1  percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

PCC--D. Cost Control--

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10 percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

PCC--F. Termination--

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 20 percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 20 percent.


 

PCC--H. Disputes and Settlement--

The arbitration shall be conducted in the place mentioned below;
[state name of place with location and district ]
 

The arbitration shall be conducted in the place mentioned below;
DPHE Bhaban , Kakrail Dhaka 
 

Meeting End Date & Time 04/07/2021 17:00 07/07/2021 17:00
Last date & time for Tender/Proposal Security Submission 08/07/2021 13:59 12/07/2021 13:59
Start Date(Lot No : 01) 15/07/2021 25/07/2021
Closing Date & Time 08/07/2021 14:00 12/07/2021 14:00
TDS/PDS--A. General--

 

The PE is Jayanta Mallick

 

 

 

The Name of the Tender is:Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021
Brief Description of the Works:Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021

Tender Ref:46.03.0100.061.14.172.16.1030 Dated-20/6/21
Lot No(s):01

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

 

The Procuring Entity is Executive Engineer,DPHE,Bagerhat District, Bagerhat

 

 

 

The Name of the Tender is:Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila For Landless and Houseless Family Through Mujib Barsho  In Bagerhat District Under Revenue Budget FY-2020-2021
Brief Description of the Works:Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila For Landless and Houseless Family Through Mujib Barsho  In Bagerhat District Under Revenue Budget FY-2020-2021

Tender Ref:46.03.0100.061.14.172.16.1030 Dated-20/6/21
Lot No(s):01

[if there is more than one(1) lot, individual lots are to be identified in conformity with Section 6: Bill of Quantities]
 

TDS/PDS--B. Tender Document--

Allowed to post clarification till [Date and Time] n/a

Allowed to post clarification till  is N/A

TDS/PDS--C. Qualification Criteria--

The minimum amount of liquid assets or working capital or credit facilities of the  Tenderer shall be Tk 20 lac

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The minimum amount of liquid assets or working capital or credit facilities of the  Tenderer shall be Tk 20 lac

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

TDS/PDS--C. Qualification Criteria--

The minimum capacity shall be:Tk.24 lac
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

The minimum capacity shall be:Tk.24 lac
The following formulae shall be used to calculate the Tender Capacity
Assessed Tender Capacity = (A*N*1.5-B)

Where
A=Maximum value of Works performed in any one year during last five years
N= Completion time of the proposed work in years
B= Value of Existing commitments and works to be completed during the next N Years

For Tenders where the package contains more than one (1) Lot, this qualification requirement shall be mentioned separately for each lot in the package
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one)
 

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk  40 lac  over the last 05 years.

The required average annual construction turnover shall be greater than Tk  40 lac  over the last 05 years.

TDS/PDS--C. Qualification Criteria--

A satisfactory completion of similar works of rain water harvesting work of at least Tk 20  lac under 01 of contract over a period of 05 years shall be required.

A satisfactory completion of similar works of rain water harvesting work of at least Tk 20  lac under 01 of contract over a period of 05 years shall be required.

TDS/PDS--D. Tender Preparation--

Tenderer shall submit with its Tender, the following additional documents: n/a

Tenderer shall submit with its Tender, the following additional documents: 

Following Updated Documents:
1. Trade Lisence
2. Bank Statement/ Liquid Asset/Credit lines(Facilities)
3. TIN Certificate
4.VAT Registration Certificate
5.Authorization Letter
6. Litigation History
7.Man power List.
8.Equipment List
9.Work plan
 

TDS/PDS--D. Tender Preparation--

The Tender Validity period shall be120  days.

[normally 60 to 90 days deemed reasonable]
 

The Tender Validity period shall be120  days.

TDS/PDS--D. Tender Preparation--

The amount of the Tender Security shall be As per IFT
[note: Not exceeding three percent (3%) of the official estimated cost but as a fixed amount] 

 

The amount of the Tender Security shall be As per IFT
 

TDS/PDS--E. e-Tender Submission--

The deadline for lodgment of e-Tenders is [state time, and identify AM or PM e.g 10.30 a.m]
[state date, e.g 15 June,2011  ]. As per IFT
 

The deadline for lodgment of e-Tenders is  As per IFT
 

Brief Description of Goods,Works or Service

Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila In Bagerhat District Under Revenue Budget FY-2020-2021

Construction of Rain Water Harvesting (RWH) Total 70 nos. at Morrelganj Upazila For Landless and Houseless Family Through Mujib Barsho In Bagerhat District Under Revenue Budget FY-2020-2021

 