(a) Ward no-03, construction of RCC road at Kamalgonj Govt. College [53m].
(b) Ward no-01, construction of RCC road at Gopalnagar Hena/Suvash Dev house road [75m].
(c) Ward no-02, brick drain at Borgach in front of Babul's house west side to west side at Omor's house [60m].
(d) Ward no-02, construction of RCC road at Borgach in front of Ayub Ali house to west side Shamsul islam house [17m).
(e) Ward no-03, construction of RCC road at Nasrathpur Malakar Para Rashendra Malakar house [35m].
(f) Ward no-04, construction of RCC road with palisading work at Nagar road via Norendrapur Torab Ali house [30m].
(g) Ward No-04 installation 05 (five) nos shallow tubewell among the poor people.
(h) Ward no-04, brick drain at North side of Alepur Abdul Mannan house [83m].
(i) Ward no-05, construction of RCC road at North Alepur in front of Abdul house to the former counsilor Romuj Miah house [74m].
(j) Ward no-06, Re-construction of RCC road and drain culvert at South Kumrakapon In front of Rahmat Miah house to Chadur Munshi house [59m].
(k) Ward no-07, construction of RCC road at Sadhupara Rintu house to Mokul Babu house road [31m].
(l) Ward no-08 Construction of RCC road widening with drain cover slab at Kumrakapon west side of Alik Miah chairman house to end point [51.50m]
(m) Ward no-09, construction of RCC road at Rampasa Abdur Rahim house to Sorab Miah house [71m].
(n) Ward No-1,2,3 Installation 8 (Eight) Nos Shallow Tube well at Poor People.
(o) Ward no-4,5,6, Installation 11 (eleven) nos shallow tubewell among the poor people.
(p) Ward No-7,8,9, Installation 8 (eight) nos shallow tube well among the poor people.
|