| Brief Description of Works : |
AT PHT: Repairs to gas connection pipe line & making, fitting, fixing of riser setup position & other allied works of quarter no. (A) Ambagan Colony quarter No. 20/1-B, 713-B, D, 710/C, T/15-AB, T/517-AB, 716-ABCD, T/518-AB, 708-ABCD, 643/B, T/523-A, L/292-AB, L/293-AB, 807/A, 641/ABF, T/504-B. (B) Segun Bagan quarter No. L/66 (3 Unit), 61/D, L/60-A, L/768 (3 units), L/64-B, L/63 (A, D, E, G, H) (5 Unit), L/69 (3 units), L//800 (3 units), L/770-B, L/861-D. (C) Warless Colony quarter No. L/50-L, L/57-K, L/18-F, I, G, L/15-B, L/45-A, L/51-I, L/27-F, L/20-E, J, L/1-K, L/14-K, L/44-C, L/9-H, L/38-A, C, G, L/8-L, L/41-E, L/53-DL, L/16-FI, L/25-C, L/58-G, L/39-B. (D) New Jhautala Colony quarter No. 4/2-L, 3/2-C, L/797-AB, 47/AB, 49/AB, L/831-AB. (E) Master Lane quarter No. L/21-C, EK/44-L, L/194, M/20-AB, S/3-B. (F) Engineering Colony quarter No. M/581-AB, E/10-AB. (G) Station Colony quarter No. L/131-AB (H) XEN Colony quarter no. L/772 (3 units), L/777-F. (I) Shahid lane colony quarter no. L/668(AB), L/669(AB). (J) Hospital colony quarter no. E/653 (4 units). (K) TPP colony quarter no. L/780-B, L/800-AB, L/786-AB, L/784-AB. (L) Signal colony quarter no. L/190-AB Total 123 units.
|