As a stated in tender document.
At CGPY-FJT (Faujdarhat) section: Construction of ballast wall and maintenance of existing track formation by reprofiling bank profile with other allied works at km. 6/4-8/4 (both side) in between CGPY-FJT (Faujdarhat) section as per approved drawing.